Start with one changed requirement and the decision that depends on it. Put the old and new wording side by side, identify the added condition and outcome, and open the linked verification content. The free worksheet keeps that comparison, its evidence limits and the next owner in one record. In this illustrative case, a reading viewer updates its display while connected. The revised requirement adds automatic updates after the connection is interrupted and restored, without a manual application restart. These are chosen teaching statements. No application has been run, and no normal-operation or recovery result is available. The linked plan still keeps the connection available, supplies a new valid reading, and checks the display. It never interrupts or restores the connection. That is the documentary finding: the plan does not challenge the added condition. It tells us what is missing from planned verification, without showing whether the software recovers. The exercise assumes adopted NPR 7150.2D and a Class C mapping invoking SWE-071, the plan-consistency provision. Real projects need their own applicability and authority records. The NPR mapping records the obligation; software traceability locates the related artifacts. Neither record supplies a performed result or a decision authorizing reliance. A proposed recovery check would interrupt the connection, restore it, supply a distinguishable new valid reading, and observe automatic updating without a manual application restart. An application window that remains open, or the previous reading, would not establish recovery. The requirement owner must resolve the observation window before execution. This check has not been executed. Recommend deferring reliance on this material as a demonstration of recovery. Ask the project's appointing role to name owners for clarification, verification updates and review. Then obtain and evaluate appropriate authorized evidence. Here, those actions are proposed and actual disposition is unrecorded. The designated decision authority still needs to record the reliance disposition.