The author's draft promises that a same-key retry before twenty-four hours returns the original reservation without creating another. It is teaching intent, with no customer approval. The five requirement times are zero, one, twelve, twenty-three and twenty-three-and-a-half hours. Twenty-four and twenty-four-and-a-half produce second reservations but remain diagnostic, with an unresolved oracle. These selected values promise no clock granularity. Each scenario starts a fresh in-memory SQLite store. Time is supplied numerically, without waiting hours. Honest setup and retry use the unchanged reservation method. The literal expectation is integer ID one, the original reservation, and the complete ordered row list containing only that reservation. The primary run used CPython 3.14.7 and SQLite 3.53.4. State is read through that same live connection. No HTTP, concurrency, restart or production-clock behavior was tested. The original and restored settings, A and C, retain keys for twenty-four hours and each pass five requirement cases. The shortened setting B retains them for twelve, passing two and failing three: twelve, twenty-three and twenty-three-and-a-half hours return ID two, a second reservation, with rows one and two showing both original and duplicate. Restoring retention to twenty-four is the executed configuration correction; C replays the same cases. The deliberately bad harness skips the retry and returns the cached setup ID. At B's twelve-hour case, output and actual rows look correct. The observer matches the real method's code object and records only setup, making the harness invalid. Honest execution records setup and retry. Call evidence does not establish branch coverage. Write both expectations from the promise: return the original reservation and create no second one. Do not copy the implementation's expiry comparison. Confirm that setup and the real retry ran before comparing their actual response and stored effects. Assign the intended behavior at and after twenty-four hours to the policy owner. Name who will review the project's requirement, oracle and harness, and who can accept the change. Those decisions remain unperformed here.