# Software verification plan

**Status: DRAFT — not approved**  
**Plan ID:** [ID] · **Revision:** [revision] · **Date:** [date]

This original Proof template is a starting point for a bounded change, component or release. Replace every bracketed field. Reference existing controlled records where appropriate. Do not treat a completed form as executed evidence or approval. Tailor it to the actual standards, contract and assurance process that apply.

## 1. Identity and authority

| Field | Record |
|---|---|
| Project / release / change | [identity] |
| Plan owner | [person and role] |
| Prepared by | [person, date] |
| Reviewers | [roles, people, required separation] |
| Approval authority | [person or governed policy] |
| Review / approval status | DRAFT; [pending actions] |
| Related development / quality plans | [controlled references] |

## 2. Scope, baseline and exclusions

- Software, work products and interfaces: [scope].
- Requirement baseline: [document/graph/version or commit].
- Candidate implementation: [repository, revision, build and configuration].
- Dependencies and reused components: [identities and versions].
- Included configurations and operating conditions: [conditions].
- Exclusions, rationale and owning plan: [each exclusion].
- Assumptions requiring resolution: [assumption, owner and due point].

## 3. Applicable basis and risks

Distinguish binding requirements from informative guidance.

| Source / edition | Applicable obligation | Plan response / owner |
|---|---|---|
| [standard, contract or policy] | [clause or obligation] | [record] |

| Risk / consequence | Related requirement | Planned treatment | Owner |
|---|---|---|---|
| [failure consequence] | [requirement ID] | [method, rigor, dependency] | [owner] |

## 4. Verification strategy and methods

Explain why the selected checks can establish each scoped claim. Consider requirements/design review, static or formal analysis, tests at appropriate levels, interface checks, failure injection and other methods justified by the work. A numeric metric needs its scope and interpretation.

- Priorities and rationale: [risk, uncertainty and consequence].
- Levels and methods: [method, purpose, limit].
- Reused evidence: [reference, compatibility assessment and authority].
- Coverage basis, where applicable: [criterion, tool, target, exclusions].
- Work assigned elsewhere: [owning plan and evidence interface].

## 5. Verification register

Repeat this record per obligation, or use `verification-register.csv`.

| Field | Planned value |
|---|---|
| Obligation ID | [unique ID] |
| Requirement / risk and revision | [ID and exact claim] |
| Method and level | [review / analysis / test / demonstration; scope] |
| Preconditions, inputs and procedure | [controlled reference] |
| Expected observation / acceptance rule | [observable result, including relevant state] |
| Environment and configuration | [baseline or reference] |
| Executor / reviewer | [assigned roles and people] |
| Required evidence IDs and location | [outputs that must exist; planned location] |
| Milestone / dependencies | [entry conditions, due point, blocker] |
| Execution status and result | PLANNED; [fill only after performed work] |
| Evidence identity and limitations | [run, revision, time, tool, environment, limits] |
| Disposition / acceptance | PENDING; [authority, decision, conditions, date] |

## 6. Validation activities or linked validation plan

If this is a combined software verification and validation plan, include intended-use activities. Otherwise identify the controlled validation plan or justify the scoped exclusion. Validation can begin during requirements development.

- Intended users, user needs and operating context: [description].
- Representative scenarios and participation: [users/stakeholders and scope].
- Method and success criteria: [observable operational outcomes].
- Environment and important differences from use: [description].
- Responsible person and decision authority: [roles/people].
- Evidence and current status: PLANNED; [location and record].

## 7. Environments, tools, data and resources

- Execution environment and target relationship: [versions/configuration/differences].
- Test tools and suitability / qualification controls if applicable: [basis].
- Test data and provenance: [data sets, construction, privacy/access rules].
- Infrastructure, access and staffing: [requirements and owners].
- Readiness checks and unavailable resources: [criteria / blockers].

## 8. Roles, review and independence

| Activity | Responsible person / team | Reviewer / authority | Required separation |
|---|---|---|---|
| Plan and criteria | [owner] | [reviewer] | [basis] |
| Execution / analysis | [owner] | [reviewer] | [basis] |
| Validation | [owner] | [stakeholder] | [basis] |
| Evidence acceptance / exceptions | [owner] | [authority] | [basis] |

## 9. Schedule, milestones, entry and exit conditions

| Milestone | Dependencies / entry conditions | Expected evidence / exit conditions | Owner / date |
|---|---|---|---|
| [requirements review] | [inputs] | [review record] | [record] |
| [integration readiness] | [inputs] | [environment and checks ready] | [record] |
| [candidate acceptance] | [inputs] | [results, issues and authorized decision] | [record] |

Reserve time for failures, repairs, impact assessment and reruns: [allocation].

## 10. Execution, results and anomalies

- Execution procedure / command and required outputs: [reference].
- Stop / restart rules: [conditions and owner].
- Statuses used: [planned, partial, failed, blocked, stale, supported; define locally].
- Anomaly record: [requirement, observation, expected result, baseline, severity, owner].
- Correction and retest process: [procedure and evidence to preserve].
- Exceptions: [authorized decision, scope, rationale, limits, follow-up, expiry if applicable].

An accepted exception remains identifiable as an exception. Do not relabel an unperformed or failing check as a passed test.

## 11. Versioned evidence and traceability

- Link chain: [requirement → obligation → procedure → result → disposition].
- Identity retained: [plan, requirements, source, tools, data, configuration, time].
- Storage and retention: [location, access, duration and integrity controls].
- Missing or invalid records: [detection and disposition].
- Review record: [reviewer, scope, findings and limitations].

## 12. Changes, reruns, report and acceptance

- Change triggers: [requirement / implementation / dependency / environment / procedure].
- Impact assessment and required reruns: [decision process and owner].
- Evidence reuse assessment: [basis, limitations and authority].
- Completion report: [results by obligation, deviations, unresolved issues and proposed disposition].
- Acceptance decision: PENDING — [authority, decision, scope, conditions, date].
- Next review: [trigger or date].

## References and provenance

Original Proof template, prepared 27 October 2026. It is not a licensed standards template and carries no compliance or certification claim.

- Guide: https://reqproof.com/topics/software-verification-plan
- NASA lifecycle planning: https://swehb.nasa.gov/spaces/SWEHBVD/pages/102695668/5.08+-+SDP-SMP+-+Software+Development+-+Management+Plan
- NASA verification and validation: https://www.nasa.gov/ivv-overview/
- NASA software lifecycle requirements: https://nodis3.gsfc.nasa.gov/displayDir.cfm?Internal_ID=N_PR_7150_002D_&page_name=Chapter4
- UK Teal Book V&V: https://projectdelivery.gov.uk/teal-book/home/part-f-solution-delivery/chapter-34-verification-and-validation/

This template and original teaching code may be adapted under the included MIT license. Third-party sources retain their own terms.