Observed exhibit: a deleted entry receives permission instead of refusal.

Review field / Recorded value
Review field Recorded value
Selected deletion check TestTombstoneIsNotServed, included with the requirement build tag
Input to the helper Fresh=true, Hit=true, Stale=true, Deleted=true
Expected / observed false (refuse permission) / true (permit serving)
Execution result Requirement-only Go command fails with exit 1
Correction and decision Repair proposed and unperformed; no project acceptance recorded

This is an archived teaching observation from 27 October 2026. Inspect the failed output and its capture provenance. The full example separates this Go-only capture from the earlier structural measurement.

01 / Establish the basis

What does DO-178C verification establish?

DO-178C's full title is Software Considerations in Airborne Systems and Equipment Certification. Its European counterpart is ED-12C. The FAA's AC 20-115D recognizes them as an acceptable means for the software aspects of type certification or Technical Standard Order authorization. The circular is not itself a regulation or the only means; using its approach entails following it in all applicable respects. FAA §§1–2

For a real review, identify the governing plans, adopted documents and editions, applicable errata, software-level assignment source and responsible authorities. This worksheet organizes a small engineering inspection within that process. It does not replace controlled project lifecycle data or the applicable objectives.

Where one evidence chain fits in the lifecycle

The lifecycle includes planning, development, verification, configuration management, quality assurance and certification liaison. The following map names representative data and the question to ask about a change. It is not a complete deliverable list, and every row does not apply identically at every software level. FAA §§4 and 6

Lifecycle orientation: locate existing project records before creating another form.

Area / Representative data / Question for this change
Area Representative data Question for this change
Planning and certification approach Plan for Software Aspects of Certification (PSAC), adopted methods, responsibilities and planned evidence. Which basis and activities apply, and who resolves uncertainty?
Requirements and design High-level software requirements describe system-allocated behavior; low-level requirements provide traceable implementation detail. Is the changed behavior authorized, including derived requirements and assumptions?
Verification Software Verification Plan (SVP), review and analysis records, test cases, procedures and results. What must be checked, what actually was checked, and what remains open?
Implementation and configuration Source, executable, build and configuration records; Software Configuration Index (SCI) and lifecycle environment identification. Does the evidence belong to the candidate and the relevant environment?
Control and discrepancies Configuration-management, quality-assurance and problem records; change-impact assessment. What changed, which evidence is affected, and who owns the findings?
Accomplishment and authority Software Accomplishment Summary (SAS), actual status and outstanding problems, with underlying evidence and decisions. What work was completed, and what has the responsible authority accepted?

The data names come from the FAA's historical comparison guide, section 11 and Order 8110.49A, chapter 1 §7; the requirements explanation comes from technical research, appendix B.6.1, not FAA policy. The Order distinguishes an SVP from the FAA-approved system test plan for official certification-credit testing. Chapter 4 §3

Software levels A to E: obtain the actual assignment

Category associations in transport-category rotorcraft guidance. The following associations appear in FAA AC 29-2C, Change 9, Figure AC 29.1309-2, printed page F-40.6. They provide orientation to that source, not a general rule for assigning a project's software level. FAA figure

Software level / Failure-condition category shown in that figure
Software level Failure-condition category shown in that figure
A Catastrophic
B Hazardous or severe-major
C Major
D Minor
E No effect

Use the actual system-development and safety-assessment basis, together with the applicable authority arrangements, to identify the assigned level. Code size, language, an AI confidence score or this table cannot assign it. Guidance for specific regulations can take precedence. FAA Order, chapter 2 §2.b · AC 20-115D §6.e

What structural coverage contributes

Modified condition/decision coverage (MC/DC) examines each condition's independent effect on a decision, alongside the criterion's other structural obligations. An independence witness is a pair of cases demonstrating that effect under the selected criterion. Here, independence means a condition's demonstrated effect on the decision; it does not establish independence between people performing verification. NASA tutorial, §§2.2–2.4

Separately from the rotorcraft table, NASA's 2012 technical explanation summarizes statement coverage for Level C, statement and decision coverage for B, and those plus MC/DC for A. It describes no structural-coverage-analysis requirement for D; that does not mean no verification. This is historical explanatory research, not a current objective or independence matrix. Holloway, §4

Requirements-based verification asks whether the specified behavior occurs. Structural analysis examines what implemented structure those checks exercised. A requirement can be approved while its implementation fails; a test can pass with an unjustified expectation; a result can describe an obsolete baseline. Keep those questions separate. NASA's older coverage tutorial explains the requirements/structure distinction in a DO-178B context; its objective references are not a DO-178C mapping. NASA §2.2

02 / Start with the record

Free assurance review worksheet

Copy this complete human record into an issue or review document. It works without Proof or signup. Start with the decision, requirement and candidate, then fill one claim block from an original observation. Complete the remaining fields before relying on the record for its intended decision. Reference existing controlled plans rather than copying them into every review.

Prerequisites are access to the requirement's source, the relevant implementation and checking procedure, and any original evidence being assessed. Missing material is a finding to assign. Replace UNRECORDED with an identity or decision. Use NOT PERFORMED only when nonperformance is known, and NOT APPLICABLE only with a reason and its decision owner. The oracle field records why the expected result is justified independently of the implementation being checked. This is a human worksheet, not an AI prompt or a prescribed certification deliverable.

ASSURANCE CHAIN REVIEW

A. DECISION, APPLICABILITY AND AUTHORITY
Record identity / revision: UNRECORDED
Software item / change / scope / exclusions: UNRECORDED
Decision requested and review trigger: UNRECORDED
Record owner, named person or queue: UNASSIGNED
Governing plans and revisions: UNRECORDED
Adopted documents / editions / applicable errata: UNRECORDED
Assigned software level and assignment source: UNASSESSED
Applicability interpretation / authority / decision reference: UNRECORDED
Certification use of this record: NOT ESTABLISHED

B. REQUIREMENT, DOMAIN AND CONTROLLED BASIS
Requirement identity / revision / exact behavior: UNRECORDED
Parent or source / assumptions / relevant robustness behavior: UNRECORDED
Requirement authority / approval state / decision reference: UNRECORDED
Input domain / units / state / feasibility constraints: UNRECORDED
Design and source identities: UNRECORDED
Test or review procedure identity / revision: UNRECORDED
Actual entry and call path from check to implementation: UNRECORDED
Build / executable / configuration / data identities: UNRECORDED
Tool versions / settings / exact commands and working directory: UNRECORDED
Environment / target identity and readiness prerequisites: UNRECORDED
Host, simulator, instrumented or target differences: UNASSESSED
Actual AI assistance / tool use / retained history, or unknown: UNRECORDED

C. CLAIM BLOCK: REPEAT FOR EACH DISTINCT EVIDENCE CLAIM
Claim identity / bounded claim: UNRECORDED
Method / reason it addresses the claim: UNRECORDED
Preconditions / inputs / expected output and relevant effects: UNRECORDED
Oracle source / independent justification / unresolved interpretation: UNRECORDED
Actual observation and execution or review timestamp: UNRECORDED
Raw result / report / provenance / integrity references: MISSING
Trace: requirement > design/code > assertion/procedure > result: UNRECORDED
Trace semantic review / reviewer / controlled record: UNRECORDED
Support status and reason: MISSING
Evidence class: archived execution, new execution, review or analysis: UNRECORDED
Currency for candidate / changed basis / justified reuse: UNASSESSED
Requirement coverage: supported behavior / missing behavior: UNASSESSED
Structural coverage: criterion / variant / scope / counting unit: UNASSESSED
Structural result / denominator / exclusions / unsupported scope: UNMEASURED

D. APPLICABLE OBJECTIVES AND REVIEW ARRANGEMENT
Objective applicability or mapping status: UNVERIFIED
Adopted normative source / exact locator / applicability rationale: UNRECORDED
Separate controlled mapping record / verifier / resolution owner: UNRECORDED
Requirement author / implementer / test designer / executor: UNRECORDED
Reviewer / competence basis / work products reviewed: UNRECORDED
Required independence basis and affected activity: UNASSESSED
Actual separation / conflicts / assessor / decision record: UNASSESSED

E. TOOL RELIANCE
Tool / version / configuration / actual intended use: UNRECORDED
Output relied on / error it could introduce or miss: UNASSESSED
Subsequent verification of that output / responsible person: UNRECORDED
Lifecycle activity reduced or eliminated in reliance on tool: UNASSESSED
Qualification assessment authority / decision / record: UNRECORDED
Separate qualification evidence reference if applicable: NOT ESTABLISHED

F. FINDINGS, CHANGE AND DECISION
Discrepancy / expected versus actual / affected claim: UNRECORDED
Disposition / rationale / authorized decision reference: OPEN
Correction status: PROPOSED / IMPLEMENTED / EXECUTED, with evidence: UNRECORDED
Replay or retest status / changed baseline / result: UNRECORDED
Corrective action / named owner or queue / due date or trigger: UNASSIGNED
Change impact: requirements, code, tests, interfaces, tools, target: UNASSESSED
Evidence to renew or reuse / rationale / responsible reviewer: UNRECORDED
Stale-evidence triggers and next review trigger: UNRECORDED
Bounded conclusion / remaining evidence gaps: UNRECORDED
Acceptance authority and scope of authority: UNRECORDED
Acceptance decision / reviewed baseline / decision record: PENDING
Outstanding work / named owner or queue / next action: UNASSIGNED

Keep support, currency and acceptance separate

Use SUPPORTED only for a stated claim whose required evidence meets its criterion on the recorded basis. Use FAILED for an observed contradiction, PARTIAL for incomplete support, MISSING for absent evidence and BLOCKED for an identified obstacle.

Record the evidence class separately, then its currency: CURRENT FOR RECORDED BASIS, STALE or UNASSESSED, with any reuse decision stated explicitly. An archive can remain valid evidence about its original source without supporting a later change. Acceptance stays PENDING until an authorized decision exists. An exception retains its own rationale and authority; it does not rewrite a failure as a pass.

Filled record: the deleted-entry promise

This complete teaching record retains the observed failure and the unresolved project decisions. Paths are relative to the existing do178c-review-evidence/ kit unless a full URL is given. Its source, commands and observations are explained next.

ASSURANCE CHAIN REVIEW: TEACH-CACHE-02

A. DECISION, APPLICABILITY AND AUTHORITY
Record identity: TEACH-CACHE-02, a teaching label; controlled project revision
not established.
Software item/scope: unchanged Go ServeCached Boolean helper, directly invoked
by local tests. No deployed cache, airborne system or customer incident.
Decision: does the retained evidence support refusing a deleted entry?
Record owner: UNASSIGNED for any real project.
Governing project plans/revisions: NOT ESTABLISHED.
Adopted project documents/editions/errata: NOT ESTABLISHED; public standards
sources provide context, not an adopted certification basis for this fixture.
Assigned software level/source: NOT ASSIGNED.
Applicability authority/decision reference: NOT ESTABLISHED.
Certification use: NOT ESTABLISHED.

B. REQUIREMENT, DOMAIN AND CONTROLLED BASIS
Requirement: a deleted entry must not be served. At this helper boundary,
Deleted=true must return false, refusing permission to serve.
Requirement identity: TEACH-CACHE-02; project revision/approval not established.
Source/assumption: the explicit teaching promise, expressed by the opt-in
requirement test. No approved airborne parent requirement is supplied.
Domain: Fresh, Hit, Stale and Deleted are Boolean fields. The selected local
inputs are executable; no production-state feasibility or exhaustive analysis
is established. There are no physical units or durable-state observations.
Implementation: fixture/cache/cache.go, function ServeCached.
Implementation SHA-256:
d8b9e3ccb71fd01449dac6c2dc9c652e1d6c80c65ed1c742f92c8f01e4fc9c86
Checking source: fixture/cache/requirement_test.go, TestTombstoneIsNotServed;
ordinary cases are in fixture/cache/cache_test.go, TestIndependence.
All source/test identities: fixture/evidence/provenance.json and
captured/provenance.json, whose source hashes match.
Call path: reproduce.py > selected go test with the requirement build tag >
TestTombstoneIsNotServed > ServeCached(e) > if the return is true, t.Fatal.
Build/configuration: module example.com/proof-mcdc-cache; go.mod declares
Go 1.22. A separate executable digest or target-load identity is not supplied.
Archived runtime: go version go1.26.3 darwin/arm64.
Archived platform: macOS-26.5-arm64-arm-64bit-Mach-O.
Runner prerequisites: Python 3.9+ and installed Go 1.22+; actual Python version
is not recorded. No external modules, pip packages, Proof CLI or service needed.
Runner command, from extracted kit root:
python3 reproduce.py --output rerun-results
Recorded Go commands, working directory fixture/:
go test -count=1 -v ./cache
go test -count=1 -tags requirement -run TestTombstoneIsNotServed -v ./cache
Runner settings: GOTOOLCHAIN=local, GOPROXY=off, GOSUMDB=off;
GOCACHE is a fresh temporary cache, removed after execution.
Host/target differences: no airborne target or target-comparison evidence.
Historical AI assistance/model/authorship history: NOT_ESTABLISHED.

C. CLAIM AND OBSERVATIONS
Claim: refuse permission for the selected deleted entry.
Method: direct executable assertion of the helper's returned Boolean.
Input: Fresh=true, Hit=true, Stale=true, Deleted=true.
Expected: false, refusing permission; actual: true, permitting serving.
Oracle justification: the deletion promise requires refusal regardless of the
other flags. The expected result is not inferred from today's helper output.
Unresolved interpretation: no project authority has adopted this teaching rule.
Observed failure: "a deleted entry must not be served"; Go exit 1.
Capture time: 2026-10-27T21:23:11.978488+00:00.
Raw result: captured/requirement-stdout.txt.
Provenance/integrity: captured/provenance.json; captured/SHA256SUMS.
Public result:
https://reqproof.com/assets/do178c-style-verification/research-rerun/captured/requirement-stdout.txt
Trace: teaching promise > ServeCached > named assertion > failed output.
Semantic linkage is inspectable in these files; a controlled project review,
reviewer identity and review approval are NOT ESTABLISHED.
Support status: FAILED for the selected input and unchanged fixture.
Evidence class: archived standalone Go execution, 27 October 2026.
Currency: CURRENT FOR RECORDED BASIS; reuse for a changed candidate UNASSESSED.
Other behavioral evidence: four ordinary subcases A-D pass with Deleted=false;
captured/independence-stdout.txt records them. They do not check deletion.
Outer Python exit 0: expected ordinary-pass/requirement-fail contrast reproduced;
it is not a passing deletion requirement or acceptance decision.
Structural evidence: separate archived measurement on
2026-10-09T15:24:01.959941+00:00, proof 0.1.0-dev+geeb5981c.
Historical command: proof mcdc measure ./cache --engine go --format json
Report: fixture/evidence/mcdc.json; one measured decision, 3/3 conditions with
witnesses, four runtime samples. Conditions: e.Fresh, e.Hit, !e.Stale.
Scope/limits: Deleted is absent; skipped evaluations remain distinguishable
from evaluated false. Project criterion/variant acceptability is UNASSESSED.
No Proof binary ran and no new structural measurement was made in the
27 October capture. No current-product validation is inferred from either archive.

D. APPLICABLE OBJECTIVES AND REVIEW ARRANGEMENT
Objective mapping, adopted normative locators and applicability: UNVERIFIED.
Separate controlled mapping/verifier/resolution owner: NOT ESTABLISHED.
Project requirement author, implementer, test designer and executor roles:
NOT ESTABLISHED by these teaching records.
Project reviewer, competence, required independence, actual separation,
conflicts and decision record: NOT ASSESSED.
TestIndependence and independence-* filenames concern Boolean conditions;
they do not identify an independent human review arrangement.

E. TOOL RELIANCE
Actual roles: Go executes selected assertions; Python checks source identities
and the declared reproduction contrast; historical Proof reports structure.
Potential reliance gap: wrapper success can be mistaken for requirement success;
structural witnesses can be mistaken for evidence of the omitted deletion rule.
Subsequent project verification/responsible person: NOT ESTABLISHED.
Project lifecycle work reduced/eliminated because of tools: UNASSESSED.
Qualification authority, decision and supporting records: NOT ESTABLISHED;
no qualification assessment or certification credit is claimed.

F. FINDINGS, CHANGE AND DECISION
Discrepancy: the helper omits Deleted and returns permission when refusal is
required by the teaching rule. The failure remains OPEN.
Disposition/authorized decision: none recorded.
Correction: adding !e.Deleted is PROPOSED AND UNPERFORMED.
Repair implementation, repaired replay and renewed coverage: NOT PERFORMED.
The archived runner checks unchanged source and expects the failure; it is
not a repaired-candidate acceptance procedure.
Proposed actions, all with named person/queue UNASSIGNED:
  Requirement owner: resolve/adopt the intended rule before project use.
  Developer: implement the authorized correction on an identified new baseline.
  Verification owner: plan behavioral reruns and renewed structural analysis;
  assess any required integration, target and robustness evidence.
  Assurance lead: establish applicability, review separation, tool reliance
  and the actual authority for the intended decision before taking credit.
Change impact: adding a condition changes the measured decision. Retain the
old report for its original basis; it does not cover the proposed repair.
Stale-evidence triggers: changed requirement/oracle, source, test selection or
build tag, inputs, compiler/build settings, configuration, environment/target,
tool version or relied-on use. Assess impact before claiming reuse.
Conclusion: this recorded input contradicts the deletion promise. Ordinary
passes and historical structural evidence remain bounded observations.
Open scope: no exhaustive input analysis, target integration, timing,
concurrency, safety assessment, qualification or project review acceptance.
Acceptance authority/scope: NOT ESTABLISHED. Decision: PENDING.
Next review trigger: before applying this teaching chain to a real candidate,
assign the project owners and obtain its actual requirement and assurance basis.

For a real review, replace the teaching basis and unassigned roles with the project's authorized requirement, revisions and responsible people.

03 / Inspect the counterexample

Four passing subcases. One omitted requirement.

This deliberately incomplete Go cache helper is teaching software. Its deletion promise is that a deleted entry must be refused. The return value is permission: true permits serving and false refuses it. The implementation instead permits serving whenever the entry is fresh and either a hit or not stale, without checking deletion:

Implementation under review: unchanged ServeCached helper.

type Entry struct {
    Fresh, Hit, Stale, Deleted bool
}

func ServeCached(e Entry) bool {
    if e.Fresh && (e.Hit || !e.Stale) {
        return true
    }
    return false
}

The ordinary suite contains four subcases. Each omits Deleted from its Go struct literal, so that field defaults to false. All four pass in both archives. A separate test supplies a deleted entry and expects refusal from the teaching rule, independently of what this implementation returns.

Selected inputs and returned permission. The Boolean columns are supplied input fields. In the last two columns, true means permission and false means refusal. A-D are the original subcase labels used to locate the logs.

Case / Fresh / Hit / Stale / Deleted / Expected / Observed
Case Fresh Hit Stale Deleted Expected Observed
Fresh entry with a hit (A) true true true false true true
Fresh entry without a hit, marked stale (B) true false true false false false
Fresh entry without a hit, not stale (C) true false false false true true
Entry not fresh, with a hit (D) false true true false false false
Deleted entry with the otherwise passing hit input true true true true false true

The last row fails because ServeCached never reads Deleted. The requirement build tag includes fixture/cache/requirement_test.go; its TestTombstoneIsNotServed function calls this helper directly and fails if the returned value is true. The ordinary command does not include that tagged test. A link to A-D would therefore leave the deletion promise without its relevant assertion.

Original requirement-only output, archived 27 October 2026. This reports the helper's failed assertion, not an observed deployed cache action.

=== RUN   TestTombstoneIsNotServed
    requirement_test.go:11: a deleted entry must not be served
--- FAIL: TestTombstoneIsNotServed (0.00s)
FAIL
FAIL	example.com/proof-mcdc-cache/cache	0.297s
FAIL

Read the passing output · Inspect the failed requirement output · Get the runnable evidence kit

Technical evidence: two distinct archives

Record / Baseline and runtime / What it records
Record Baseline and runtime What it records
Archived structural measurement: 9 October 2026, 15:24:01.959941 UTC Go 1.26.3 on Darwin/arm64; proof 0.1.0-dev+geeb5981c; archived fixture source hashes One measured decision, 3/3 conditions with witnesses, four runtime samples. The conditions are Fresh, Hit and !Stale.
Archived standalone Go capture: 27 October 2026, 21:23:11.978488 UTC Go 1.26.3 on macOS arm64; source hashes match the archive; no Proof binary Ordinary suite exits 0, with A-D passing. Requirement-only command exits 1, with expected false and actual true.

The later capture reproduces the behavioral contrast without regenerating MC/DC. The earlier witnesses concern only Fresh, Hit and !Stale; they cannot establish the omitted deletion behavior. Inspect the historical measurement, original provenance and source hashes, and public capture provenance. The Proof version identifies the historical tool, not a fixture source revision.

Reproduce the two outcomes

The kit requires Python 3.9+ and an installed Go 1.22+. It needs no third-party Go modules, pip dependencies, account, Proof CLI or network service. Read the README and runner; verify the archive against its SHA-256 checksum.

From the extracted kit directory:

python3 reproduce.py --output rerun-results

The runner checks source hashes and runs these commands from fixture/:

go test -count=1 -v ./cache
go test -count=1 -tags requirement -run TestTombstoneIsNotServed -v ./cache

The expected Go exits are 0 and 1. Outer Python runner exit 0 means the expected contrast reproduced. It does not mean the deleted-entry promise passed. The runner accepts a new or empty output directory and refuses to overwrite existing results. It sets GOTOOLCHAIN=local, GOPROXY=off, GOSUMDB=off and a fresh temporary GOCACHE. Your replay would create new evidence with its own timestamp and runtime; none is claimed here.

Proposed correction, with no repair result

A candidate correction is to require !e.Deleted as well as the existing predicate. No repair was implemented or executed. There is no repaired pass result or renewed coverage report.

Adding that condition changes the decision. The old three-condition measurement cannot cover the proposed repair. Review the requirement, implement the change, rerun the relevant assertions and perform new structural analysis for the revised basis. Preserve the original failure and explain any reused evidence. The archived runner deliberately checks unchanged source hashes and expects this failure; a repaired candidate needs a separately identified baseline and a procedure that checks the corrected behavior.

No airborne target, hardware integration, timing, concurrency or exhaustive input analysis was assessed. Project safety assessment, level assignment, independence, qualification, conformity and acceptance also remain unassessed. Historical AI assistance is NOT_ESTABLISHED; these records establish neither human-only authorship nor a controlled AI-generated-code experiment. The observed failure concerns the recorded input and baseline.

Follow one requirement through the evidence

Download the spoken transcript.

Read the narration and on-screen details

1. Begin with the promise and its authority

On screen

  • Teaching helper returns permission
  • true permits; false refuses
  • Deleted entries must be refused
  • Project authority not established

Status: OBSERVED teaching source and rule; adopted project basis and requirement approval NOT_ESTABLISHED.

Narration

A small cache helper returns permission to serve an entry: true permits it, false refuses it. Its teaching promise says a deleted entry must be refused. In a real airborne-software review, begin with the authorized requirement, candidate revision and project basis before deciding what its evidence supports.

2. Inspect what the ordinary suite checks

On screen

  • Fresh && (Hit || !Stale)
  • A-D: four passing subcases
  • Deleted=false in each subcase
  • Ordinary cases do not check deletion

Status: OBSERVED in archived Go executions; limited to the four ordinary subcases.

Narration

The helper permits serving when an entry is fresh and either a hit or not stale. Four ordinary subcases, A through D, pass. Each leaves Deleted false. These observations support their particular assertions, but they do not check whether an otherwise eligible deleted entry receives refusal.

3. Keep the measurement in its archive

On screen

  • 9 October 2026: archived measurement
  • One decision; three conditions
  • Four runtime samples
  • Deleted absent from the decision

Status: OBSERVED historical measurement, 9 October 2026 15:24:01.959941 UTC; current-product validation UNPERFORMED.

Narration

An archived Proof measurement from nine October twenty twenty-six reports witnesses for all three conditions in the existing decision. Modified condition/decision coverage examines each condition's independent effect on the outcome. A witness pair supports that effect under the measurement criterion. Deleted is absent, so the report cannot establish the deletion promise.

4. Read the contradictory observation

On screen

  • All four input flags are true
  • Expected refusal; observed permission
  • TestTombstoneIsNotServed fails
  • Failed claim remains open

Status: OBSERVED helper failure; deployed serving was not observed, and repair execution is UNPERFORMED.

Narration

The separate requirement test sets Fresh, Hit, Stale and Deleted to true. The teaching promise expects false, refusing permission. The helper returns true, and the test fails with the message that a deleted entry must not be served. A trace reaching this assertion makes the contradiction inspectable; it does not resolve it.

5. Interpret the public capture correctly

On screen

  • 27 October 2026: archived Go capture
  • Go exits: ordinary 0; requirement 1
  • Python exit 0: contrast reproduced
  • No Proof run or new coverage

Status: OBSERVED standalone capture, 27 October 2026 21:23:11.978488 UTC; renewed MC/DC measurement UNPERFORMED.

Narration

A second archive, captured on twenty-seven October twenty twenty-six, repeats the contrast with unchanged source and ordinary Go commands. The ordinary suite exits zero; the requirement check exits one. The Python wrapper exits zero because that expected contrast reproduced. It ran no Proof binary and produced no new coverage measurement.

6. Leave the repair and acceptance open

On screen

  • Deleted guard: proposed only
  • No repaired test result
  • Changed decision needs new analysis
  • Project acceptance remains pending

Status: PROPOSED correction; implementation, repaired replay and renewed coverage UNPERFORMED; project acceptance NOT_ESTABLISHED.

Narration

Adding the missing Deleted condition is proposed work. No repair has been implemented or run. Because the change alters the decision, the old three-condition report cannot cover it. Record the failed claim, needed reruns, review arrangement and decision owner. Acceptance requires an authorized decision about the actual evidence and its remaining gaps.

04 / Make the review repeatable

How to review a requirement-to-evidence chain

This is a practical review procedure. Fit it to the governing plans and applicable objectives; its eight steps are not a replacement objective table.

1. Name the decision and applicable basis

Identify the software item, change and decision being requested. Separate an engineering investigation from a project release decision or certification use. Record the adopted documents, editions, applicable errata, plan revisions and actual assigned-level source where relevant. Put unresolved applicability with its responsible authority. A missing basis prevents a justified compliance conclusion even when useful technical investigation can continue.

Read the parent requirement or other authoritative source. Resolve normal behavior, relevant abnormal inputs, boundaries, state changes and assumptions. Ask who may approve the intended behavior. Intent recovered from code or generated by an agent is a candidate until the appropriate review occurs. An assertion derived from the same mistaken implementation offers little protection against that mistake.

3. Follow the chain into the actual assertion

Follow the actual entry and call path into the design or code, selected assertion or procedure, expected result and raw observation. Check what would make the assertion fail. A test name, annotation or screenshot of a successful job cannot answer that question. In the cache example, the build tag and selected test distinguish evidence about A-D from evidence about deletion.

4. Confirm what was executed and where

Retain requirement, source, test, build, data, tool and configuration identities. Identify host, simulator, instrumented build and target differences, including who assesses their significance. FAA Order 8110.49A provides a concrete certification context for controlled test baselines and loaded configurations; its staff/designee procedures are distinct from an ordinary repository run. Order 8110.49A, chapter 4

5. Review requirements coverage and structure separately

Ask which specified behaviors have meaningful observations, then examine the relevant structural report. Record its criterion, variant, scope, counting unit, exclusions and unsupported constructs. Investigate unexplained gaps. A source-level percentage also leaves applicable generated-code, object-code and interface questions to resolve. The FAA’s historical comparison guide highlights these different analysis concerns. DO-178B/C Differences Tool

6. Assess independence and tool reliance before taking credit

Identify the activity and work product being reviewed, the applicable separation requirement and the actual people involved. Then record actual tool use, including any AI assistance, and which outputs the project relies on. Leave missing tool history unknown. Do this while choosing the workflow, before reducing other verification in reliance on a tool. Different model names or another chat do not establish an acceptable independence arrangement.

7. Preserve the discrepancy and assess the change

Keep expected and observed results, affected claims, corrective action and ownership together. Examine changes to requirements, code, tests, tools, configuration and interfaces before deciding what evidence can be reused. EASA’s GM1 addresses change impact across these kinds of dependencies. A locally small edit can invalidate evidence elsewhere. GM1 to AMC 20-115D

8. Record the conclusion at the right authority

State what the evidence supports, the baseline it covers and what remains missing. Separate the technical reviewer’s assessment from requirement approval, release acceptance and regulatory decisions. Record the authority, scope and reference for an actual decision. Where no authorized decision exists, leave acceptance pending and assign the next action.

05 / Check before relying

Assurance review checklist

Use this after completing the record. An unresolved row needs a finding, owner and next action rather than a reassuring aggregate score.

Review point / Question to answer / If unresolved
Review point Question to answer If unresolved
Basis Are the governing plans, editions and applicability decisions identifiable? Escalate the basis question to its owner.
Requirement authority Is the exact behavior approved by the appropriate source? Keep recovered intent or an ambiguous oracle pending.
Semantic trace Does the linked assertion actually challenge that behavior? Repair the trace or the check.
Execution Did the intended selection reach the assertion and retain observations? Record missing or blocked execution.
Baseline Do result identities match the reviewed candidate? Assess impact and justify reuse or rerun.
Coverage Are requirements, measured structure and exclusions distinguishable? Investigate each gap within its own scope.
Review and tools Are required separation and relied-on tool outputs assessed? Obtain the project-specific decisions.
Disposition Are failures, actions and acceptance authority visible? Keep the decision open.

06 / Catch misleading shortcuts

Mistakes that weaken the assurance argument

Mistake / Consequence / Correction
Mistake Consequence Correction
Treat a publisher page as a compliance mapping Document identity becomes an unsupported objective claim. Verify applicability against the adopted edition and controlled project basis.
Equate trace coverage with behavioral verification A linked test can assert the wrong result or never run. Inspect the oracle, command selection and raw observation.
Reuse 3/3 after adding Deleted The report describes a different decision. Retain the archive and measure the revised scope.
Derive expectations entirely from generated code Implementation and test can share the same omission. Review intended behavior against its authoritative source.
Call a second model an independent verifier Required separation, competence and authority remain unknown. Assess the actual activity, people and arrangement.
Treat a tool label or qualification kit as project credit Intended use and relied-on outputs remain unexamined. Record the use case and obtain the applicable assessment.
Let a wrapper’s exit 0 erase an inner failure Successful reproduction is mistaken for successful behavior. Preserve both Go exits and the wrapper’s declared success rule.

Ask: What conclusion would still be unsupported if every dashboard indicator were green? Name that unsupported conclusion and assign the evidence it needs.

07 / Keep the chain connected

Use Proof for the records it can support

Proof connects requirements with implementation, verification and documentation. proof trace coverage computes requirement relationships and collects supported evidence information. Inspect the original requirement and oracle, source and test identities, raw result and remaining decisions: links do not establish correct expectations or actual execution. The Agents workflow describes connected context for people and coding agents.

With the appropriate Proof CLI installed, the published Go measurement workflow uses:

proof mcdc measure ./cache --engine go --format json

This supported syntax is also the command in the 9 October archive. It was not run in the 27 October capture, and that historical report is not a current-version validation. For a new campaign, check the installed version, supported scope, witnesses, exclusions and measurement guidance.

These records establish no certification of Proof's MC/DC tooling, DO-330 qualification kit, project qualification level, independence arrangement, certification credit or compliance. Those decisions remain with the actual project authorities.

08 / Choose evidence for the claim

Which method and review workflow fit?

Choose the method by what could falsify the claim, then choose how to retain its result. The following practical choices draw on the historical NASA coverage explanation, EASA GM1–3 and the source boundaries below.

Question / Useful work / Evidence to retain
Question Useful work Evidence to retain
Is this the authorized behavior? Requirements and design review, including assumptions and derived intent. Reviewed revision, findings and requirement authority’s decision.
Does this input produce the required output or state? Requirements-based execution with a meaningful oracle. Inputs, expected/actual observations, selection and baseline.
What structure did those tests exercise? Appropriate structural analysis. Criterion, scope, witnesses or outcomes, exclusions and unresolved gaps.
Do components interact as required? Interface and integration work, including relevant data/control coupling analysis. Interaction observations and the basis for the analysis.
Does a formal result address the implementation claim? Review the property, model, assumptions and correspondence. Property, model identity, result and remaining implementation obligations.
Does host evidence support target use? Configuration, environment and target assessment. Identified differences, target evidence and authorized reuse decisions.

For a bounded change, a versioned document or repository record may suffice. CI can collect observations, while a requirements platform or Proof can maintain connections. Compare whether a reviewer can retrieve the exact assertion, revision, raw result and disposition. Workflow status alone does not supply those artifacts.

Decide the review arrangement for the actual work

Record who authored the requirement, implemented the code, designed the test, executed it and reviewed the result. Identify the applicable independence provision and the separation it requires for that activity. Assess conflicts and competence. Do not infer the arrangement from job titles, different AI models or a generic “independent review” badge.

Preserve the justified arrangement, its decision and the work products it covers.

Assess a tool’s intended role before relying on it

Describe the tool version and configuration, its output, possible introduced or missed errors, subsequent verification, and any lifecycle activity reduced or eliminated in reliance on it. FAA AC 20-115D §10 points to DO-178C §12.2 and DO-330 / ED-215 for qualification assessment. A tool qualification level (TQL) depends on the applicable assessment of intended use and impact; it cannot be assigned by brand or the word “AI”. The AC's legacy-tool correlation table is not a universal classification of new tools. FAA

Where applicable, the recognized technology supplements are DO-331 / ED-218 for model-based development and verification, DO-332 / ED-217 for object-oriented technology and related techniques, and DO-333 / ED-216 for formal methods. They accompany the relevant core document. Using a coding agent alone does not establish which supplement applies. FAA §§1 and 8.a

Keep AI assistance and delivered AI distinct

A coding assistant can propose requirements, code, tests or review findings. Record its actual use, the people and review work, and any reduction in other verification. Leave unknown authorship history unknown.

A learned or learning capability delivered onboard presents its own behavior, data and operating-envelope assurance questions. Using an assistant to write ordinary software does not by itself establish such a delivered capability.

The FAA's Roadmap for Artificial Intelligence Safety Assurance, Version I, discusses AI for development, testing and requirements traceability as a research priority, including risks of spurious material and missed criteria. That is research context, not approval of an assistant or a new binding AI-code rule. FAA roadmap, printed p.23

For one bounded written decision, free Spec Lab can help interpret the rule and plan reviewable cases. Check its formula and expected outcomes against the intended behavior. It does not execute application code, measure code coverage, approve requirements or provide DO-178C or tool-qualification credit.

09 / Inspect the basis and records

Primary sources and reproducibility

Use publisher records for document identity, authority material for its stated means, and project records for actual applicability. The worksheet is original engineering guidance. Complete normative objectives, independence provisions and qualification criteria must be checked against the project's adopted licensed documents; public summaries are not substitutes.

Source roles and the passages used for this review.

Source / Relevant scope and limitation
Source Relevant scope and limitation
RTCA DO-178 overview and EUROCAE ED-12C catalogue Publisher identity: DO-178C is identified as current, published in 2011; ED-12C is January 2012. The FAA recognition record dates DO-178C 13 December 2011. Catalogue records do not supply licensed objective text.
FAA AC 20-115D and status record Active; issued 21 July 2017. §§1–2, 4, 6, 8 and 10 cover recognition, applicability, lifecycle data, supplements and qualification context. An acceptable means, not itself a regulation.
EASA June 2023 compilation, online AMC 20-115D and ED Decision 2017/020/R AMC §§1–10 and GM1–3, pp.416–430. The compilation is a convenience consolidation, not an official publication; the underlying Decisions are the formal publications. Its publication record says to check later adopted rules. June 2023 is not a blanket current-applicability finding.
RTCA FAS errata/corrigenda register Route to corrections. Identify the exact errata adopted by the project. Its Topic Papers are educational information, not regulatory approval.
FAA Order 8110.49A 29 March 2018. Chapter 1 §7 defines lifecycle/configuration data and credit; chapter 2 addresses system-safety levels and authority involvement; chapter 4 addresses staff/designee conformity work. Its procedures are not a universal repository-test checklist.
FAA AC 29-2C, Change 9, Figure AC 29.1309-2 Transport-category rotorcraft category/level associations, printed F-40.6. Used only for the bounded orientation above.
Holloway, Towards understanding the DO-178C/ED-12C assurance case 2012 research, especially §4, explaining requirements-based testing and structural coverage. Use current FAA/publisher sources for recognition and document pairings.
NASA/TM-2001-210876 §§2.1–2.4 explain testing, coverage and independence witnesses in a DO-178B context. Historical explanation, not a DO-178C objective mapping.
FAA DO-178B/C Differences Tool Revision 010, 15 March 2014; section 11 names lifecycle data and §6.4.4 discusses structural analysis. Historical comparison guidance, expressly not policy or a substitute for the documents.
DOT/FAA/TC-19/22 Appendix B.6.1, printed B-25, explains high-level and low-level requirements. Technical research, not FAA policy.
FAA AC 00-69 §§1 and 3.1–3.3: complementary best practices for change impact, coupling and design-level error handling. It states its complementary status.
FAA AI roadmap, Version I Foreword signed 23 July 2024; printed p.23 discusses development, testing and traceability research. It supplies no approval or new mandatory rule for this example or an assistant.

Retain the evidence with its identity

The runnable kit contains unchanged source and archived evidence. Its README and runner source explain reproduction. Compare the ZIP checksum and capture checksums with the relevant bytes.

Selected immutable identities. Full source, test and runner digests remain in the kit and provenance files.

go-cache-evidence-kit.zip
SHA-256 ad72e28f39348e082777200b04d5fab129d183dd30f3dfa9c636523ef9a6497a

fixture/evidence/mcdc.json: archived 9 October measurement
SHA-256 1c4764c10945679893be5a1f9c64690ae8cfa6c5e2c73b24c992b024d287c07c

captured/provenance.json: archived 27 October standalone Go capture
SHA-256 7658b4366a3403dcba0ff16636b6227a1b24e674180d11c6a33e37679e82ecf0

The original fixture archive, historical passing output and historical failing output preserve the earlier behavioral observations. The historical report and its provenance retain the measurement basis; the provenance records removal only of an ephemeral local coverage-profile path, with values and samples unchanged.

Checksums identify content. They do not prove execution, authenticate a human signer, approve a requirement or record acceptance. Keep the original observations, reviewed basis and decision record together.

10 / Apply the same questions elsewhere

Two more assurance reviews

These are illustrative review situations, with no execution or acceptance claimed.

1. The host test and deployed configuration differ

Suppose a requirement says a disabled feature must reject requests without changing stored state. A host test observes that behavior with configuration A. The proposed deployment uses configuration B, and the review has no record of the configuration loaded on the target.

Keep the host result as evidence for A. Record target/configuration support as missing. Identify whether B changes feature activation, dependencies or failure handling; then obtain the applicable integration observations and loading/configuration records. Assign the reuse decision to the project’s responsible reviewer.

The practical question is whether the evidence represents the intended candidate. A matching source revision alone cannot answer it. FAA’s conformity guidance supplies a related certification context; this hypothetical review is not a conformity inspection. Order 8110.49A

2. An agent supplies both the rule and its expected result

Suppose an agent extracts “retry three times” from existing code and creates a test expecting three retries. The product owner has not decided whether that means three attempts in total or three additional attempts. Even a later passing test would leave the meaning unresolved.

Record the extracted rule as candidate intent. Ask the requirement authority to resolve the count and terminal failure behavior, then derive the oracle from that decision. Assess the agent’s role: is its output merely proposed work that receives meaningful verification, or is other review being reduced in reliance on it?

Trace completeness cannot authorize the rule. Different models producing the same interpretation cannot supply the missing decision. The next artifact is an approved behavior and a justified checking method.

11 / Common questions

DO-178C verification questions, answered

Can a team outside aviation use these practices?

Yes. Authoritative requirements, meaningful assertions, traceability, controlled evidence and explicit decisions are useful engineering practices. Describe the practices you adopted and what they establish. Selective adoption does not make a commercial application or its tools DO-178C compliant.

Does a complete requirement-to-test trace establish verification?

It establishes recorded relationships. Inspect whether the assertion checks the intended behavior, whether the relevant command ran it, whether the observation meets its criterion and whether the result still matches the reviewed basis. The cache trace can lead directly to failed evidence.

Does 100% MC/DC mean the software is correct?

No. A structural result concerns the measured decision structure and declared criterion. Here, the historical report has witnesses for 3/3 conditions while the omitted deleted-entry behavior fails. Requirements completeness, correct expectations and other relevant behaviors need their own evidence.

Who assigns the software level, and what changes with it?

Use the actual system-development and safety-assessment basis and its responsible authorities. The level affects applicable objectives, activities and data, extending beyond coverage. The orientation above cannot assign a level to your software or to this teaching helper.

When should independence be assessed?

When assigning the applicable verification and review work, before relying on its outcome. Identify the requirement for separation, the relevant activity, actual participants and decision authority. Later review can expose gaps, but a second LLM pass does not automatically establish the required arrangement.

When does a tool need qualification?

Assess its intended use and reliance under the governing basis. Record what it produces, errors it could introduce or miss, what verifies its output and any activity being reduced or eliminated. The recognized qualification route is described in AC 20-115D §10; this worksheet neither selects a TQL nor qualifies a tool.

Can unchanged source hashes justify reusing old evidence?

They establish matching source bytes. Requirements, test selection, data, compiler, configuration, environment or intended use may still differ. Assess those dependencies and record a reuse rationale. Changing the cache decision to include Deleted necessarily creates a new structural-analysis question.

Who can accept a remaining discrepancy?

The person or body authorized for that decision under the actual project basis. Preserve the failure, disposition, rationale, scope and remaining obligations. A technical reviewer, release owner and certification authority may have different powers. This worksheet grants none of them and cannot turn a deviation into satisfied evidence.