Item / Recorded value
Item Recorded value
Input samples [FAULT, HEALTHY, FAULT, FAULT]
Required flags [false, false, false, false]
Baseline flags [false, false, false, true]
Corrected flags [false, false, false, false]
Decision boundary Agreement with this teaching rule; no vehicle allocation or timing claim.

The final baseline flag is wrong because the implementation has accumulated three faults across a sequence break. Inspect T06 and the other baseline observations.

01 / Establish the applicable agreement

What does ISO 26262 software evidence need to establish?

ISO 26262 addresses automotive functional safety. Its public scope concerns hazards associated with malfunctioning behavior of safety-related electrical/electronic systems in road vehicles. Applicability to a particular program, component or alteration needs an explicit project determination. ISO Part 1

Part 6 addresses software development, including requirements, architecture, implementation, verification, integration and embedded-software testing. It sits inside a wider lifecycle. Concept work includes item definition and hazard analysis; system work includes integration and safety validation; functional-safety management extends across the lifecycle. Part 6 · Part 3 · Part 4 · Part 2

For one allocated software requirement, separate these questions:

Question / What the reviewer needs
Question What the reviewer needs
Why is software responsible for this behavior? Upstream requirement, allocation rationale, assumptions and approving authority.
Does this candidate implement the agreed rule? Exact behavior, implementation identity, independent expectations and current observations.
Does it work across the intended boundary? Input-quality, interface, target and timing evidence under declared conditions.
Can the project accept the remaining argument? Disposed anomalies, remaining lifecycle work and the designated decision authority.

ASIL means Automotive Safety Integrity Level. Carry the applicable treatment and its rationale from the project's approved safety work. Preserve any decomposition or coexistence assumptions rather than deriving a level from test quantity, a structural metric or a tool label. Part 9 identifies these broader analysis concerns; a local output comparison cannot perform them. ISO Part 9

An implementation matching its rule also leaves a separate intended-function question: is that rule appropriate for the system's purpose? Keep that question and possible malfunctioning behavior within their actual adopted scopes. Calling a sequence “diagnostic” settles neither.

Published edition, draft revision and adopted basis

Publisher records checked 28 October 2026 identify Parts 1, 2, 3, 4, 6, 8 and 9 as published second editions dated 2018-12, with revision work at stage 90.92. ISO's equipment index lists published documents and draft successors separately.

The separate ISO/DIS 26262-6 record identifies an edition 3 draft under development, at 40.20, with the DIS ballot initiated 14 October 2026. This is not a published replacement or a project transition deadline.

Record the edition, amendments, applicable parts, contract and safety-plan revision your project actually adopted. Use the governing text and assigned safety authority for method, independence and tool-confidence decisions. The worksheet and procedure below are original engineering guidance for reviewing evidence, not a normative mapping or complete lifecycle checklist.

02 / Start with a usable record

Free allocated-requirement and assumption worksheet

Copy the entire selectable record into your controlled document, repository or issue system. No signup is required. Reference existing plans where they already establish the answer; record the change-specific details here.

Use explicit states: observed support, contradicted, unperformed, stale, or not applicable with rationale. “Unknown” identifies an unresolved answer. It never means passed. Repeat the claim and gap entries as needed.

ALLOCATED SOFTWARE REQUIREMENT / CHANGE EVIDENCE REVIEW

A. DECISION AND ADOPTED BASIS
Record ID/revision, author, review status and date:
Change ID and exact proposed decision:
Bounded claim proposed for acceptance:
Project safety/development/verification plan IDs and revisions:
Adopted standard edition, parts and amendments:
Contractual basis, applicability scope and approved tailoring:
Policy/authority for changing this basis:
Designated functional-safety acceptance authority and scope:

B. UPSTREAM ALLOCATION
Software requirement ID, revision and preserved statement:
Parent requirement, safety-goal and allocation references/revisions:
Allocation rationale, approval record and approving authority:
Applicable ASIL/treatment and authoritative rationale reference:
Inherited assumptions and their confirming owners:
Assumptions returned to system/hardware/supplier teams:
Unprovided or disputed allocation information:

C. BASELINE, CANDIDATE AND DEPENDENCIES
Before/candidate source revisions or content hashes:
Build, configuration, calibration and threshold identities:
Target, runtime, compiler/toolchain and operating modes:
Affected producers, consumers, interfaces and dependencies:
Changed interface meanings, quality conventions or timing promises:
Requirement, oracle, input and evidence identities/hashes:

D. OBSERVABLE SOFTWARE BEHAVIOR
Input domain, units, boundaries and eligibility/quality rules:
Definition of one sample, including freshness/duplicate handling:
Initial state and startup/reset/restart behavior:
Exact output predicate, threshold and observation point:
Run-breaking events; latch, clear and rearm policy:
Explicit UNKNOWN/invalid-quality behavior:
Missing-call, missing-data and stale-input behavior, separately:
Rejected/malformed inputs and behavior outside this contract:

E. TIMING AND TARGET BASIS
Claimed duration/deadline and its upstream allocation:
Exact physical/logical start event and required end event:
Clock/timestamp basis and uncertainty:
Acquisition/freshness assumptions and fault-onset relationship:
Sample period, maximum gaps, jitter and permitted omissions:
Scheduler/activation, execution and output-publication assumptions:
Target/build/load/mode/reset conditions:
Supporting analysis/measurement IDs, conditions and limitations:
Missing timing or target evidence and accountable destination:

F. CLAIM / EVIDENCE ENTRY (REPEAT)
Claim ID and exact requirement/assumption being examined:
Implementation/configuration under examination:
Method and reason it addresses this claim:
Oracle source, independent formulation and review arrangement:
Campaign input bounds, exclusions, counting unit and overlap:
Expected observation and whole-case pass rule:
Actual raw observation, result and anomaly references:
Run/review ID, date, command, environment and retained output:
Evidence currency: matching basis, justified reuse, stale or unknown:
Conclusion supported and claims explicitly left open:

G. TOOL RELIANCE AND REVIEW
Tools/versions/configuration and intended uses:
Which outputs influence which decisions:
Possible tool errors, effects and independent detection/review:
Applicable tool-confidence process and outstanding assessment:
Executor, reviewer, acceptance authority and required separation:
Evidence that the actual arrangement meets the adopted basis:

H. ANOMALY / GAP ENTRY (REPEAT)
ID, state, description and affected claim:
Consequence for the proposed decision:
Owner, next action, closure criterion and review/due date:
Disposition authority, rationale, limits and revisit trigger:
Remaining lifecycle, integration, target or validation work:

I. DECISION RECORD
Narrow finding supported by current evidence:
Unresolved assumptions, anomalies and blocked broader claims:
Decision: accept stated scope / reject / hold / not yet decided:
Authorized decision maker, authority reference, date and rationale:
Conditions, residual actions, owners and renewal triggers:

Make “not supplied” and “unperformed” actionable. Do not invent an allocation or assign a reviewer merely to fill a cell.

03 / Inspect the original failure

A consecutive-fault rule that accumulated unrelated samples

The authored teaching contract defines a fictional nonvehicle sequence processor. It is not an allocated vehicle safety requirement, a real diagnostic system, an AUTOSAR Dem design or a customer incident.

Each independent trace starts fresh, with the flag false. Each call consumes one logical sample from FAULT, HEALTHY, UNKNOWN and returns the flag after that sample. The flag is true if and only if the latest three samples are all FAULT. Fewer than three samples cannot raise it. Continued faults keep it true. HEALTHY or UNKNOWN breaks the run and clears it at that logical step. UNKNOWN does not pause the run; the flag is not latched.

A missing call consumes no modeled sample. The fixture contains no timestamps, sample period, maximum gap, scheduler, physical fault onset, actuator or real-time deadline. Its UNKNOWN policy is a deliberate teaching choice, not general automotive safety advice.

What changed in the implementation

The baseline counts faults without clearing the accumulated count on either other symbol. The corrected implementation uses a consecutive counter that saturates at three and resets on HEALTHY or UNKNOWN. The separate oracle examines trailing three-sample windows instead of using the implementation's counter. Twelve literal expected traces are also checked against that oracle.

That independent formulation helps challenge a shared coding mistake. It does not establish the adequacy of a real safety requirement or organizational independence. Inspect the implementation and runner.

Read the flags at every sample

The two selected-results files, for baseline and corrected, each contain 12 selected traces; the following table displays four of those traces:

Trace / Samples / Expected and corrected / Baseline
Trace Samples Expected and corrected Baseline
T04 FAULT, FAULT, FAULT false, false, true false, false, true
T06 FAULT, HEALTHY, FAULT, FAULT false, false, false, false false, false, false, true
T08 FAULT, FAULT, UNKNOWN, FAULT false, false, false, false false, false, false, true
T10 FAULT, FAULT, FAULT, UNKNOWN false, false, true, false false, false, true, true

T04 shows why checking only the threshold sequence misses the defect. T06 exposes accumulation across HEALTHY. T08 exposes accumulation across UNKNOWN. T10 examines clearing an already-raised flag. A trace passes only when every output flag matches, not merely its final value. Baseline selected record · Corrected selected record

The frozen campaign and its counting units

Implementation / Selected traces passed / Enumerated traces passed / Child exit
Implementation Selected traces passed Enumerated traces passed Child exit
baseline 7/12 825/1,093 1
corrected 12/12 1,093/1,093 0
off_by_one 6/12 985/1,093 1
unknown_pauses 9/12 986/1,093 1

The enumeration covers all traces of lengths 0 through 6 over the three-symbol alphabet: 1 + 3 + 9 + 27 + 81 + 243 + 729 = 1,093. All twelve selected traces are distinct and already lie within that space. Do not add the denominators. The 6,015 sample positions per enumerated implementation include repeated histories; they are a different unit from whole traces.

The seeded threshold-of-four implementation fails at [FAULT, FAULT, FAULT]: expected [false, false, true], actual [false, false, false]. The UNKNOWN-pause alternative leaves the final flag true for T10's sequence. These are two specific challenges to the checks, not an exhaustive mutation analysis. Off-by-one summary · UNKNOWN-pause summary

The outer wrapper exited 0 because the expected contrasts reproduced and source hashes stayed unchanged. That includes expected failing children. It means neither that every implementation passed nor that a project accepted the correction. The finding remains finite agreement with this contract and campaign. Execution report

Filled teaching review record

This selectable example applies the worksheet to the retained evidence. Unassigned project decisions remain explicit.

ALLOCATED SOFTWARE REQUIREMENT / CHANGE EVIDENCE REVIEW

A. DECISION AND BASIS
Record: teaching review of TREQ-DB-02, tied to the capture below.
Formal project record revision, assigned author and review approval:
not supplied. No project sign-off is claimed.
Question: does selector corrected match the authored sequence rule
within the recorded campaign?
Adopted behavior: fixture/requirements.md, identified by hash below.
Project safety plan, adopted ISO edition/parts/amendments, contract,
tailoring and basis-change authority: not supplied; no vehicle project.
Functional-safety acceptance authority: unassigned.

B. ALLOCATION
Parent requirement, safety goal, hazard analysis, allocation rationale,
approval and approving authority: none supplied.
ASIL/treatment: unassigned. No ASIL inferred from these results.
Inherited assumptions: exact three-symbol domain and fresh trace state.
Returned system assumptions: sample freshness, missing calls, timing
and downstream use need decisions before any real-system application.
Confirming project owners: unassigned.

C. IDENTITIES AND DEPENDENCIES
Before/candidate: baseline and corrected selectors in the same frozen
fixture/debounce.py; no production build or calibration is identified.
Threshold: three consecutive FAULT samples; corrected counter caps at 3.
Runtime: CPython 3.14.7, macOS 26.5, arm64; standard library only.
Interfaces: supplied symbol sequence into runner; returned flags into
oracle comparison. No sensor, ECU, actuator or vehicle interface.
Actual capture: 2026-10-27T22:39:55.846735+00:00 through
2026-10-27T22:39:56.022493+00:00.

SHA-256 identities:
fixture/requirements.md
7dbeb6a2379952002da0db0ea2bf17d7996119d0bf106fb355f9b1edcab3b397
fixture/debounce.py
7af4509b85018f3590c7c35ebfcd065addb288e1850d219c4d569d54f3cd2b49
fixture/oracle.py
4b7cf92775e0d56f746b2c547bbb4c99477b66f6ba97c6a197c0aa783b4241e7
fixture/run_traces.py
28b015ee9a99cfa71c08cca68c2bd17280266ba95e8eb85b8f48e8180f970c25
fixture/selected-traces.json
7bc48c246c72cade5824c04a5cab2e12d106bfd9c8e13330cd8d72e7dc3a0023
reproduce.py
71d035ad5472fdbeb17230aae9c6568b3e5a2d04c1f4189abfa3e793b90f3e47
captured/execution-report.json
221e9d2cca0af0b3a96d8d4493549dd0f24ed881aa26bb5df7cdb04a18e2fd47

D. BEHAVIOR
One call consumes one logical FAULT, HEALTHY or UNKNOWN sample.
Each independent trace starts fresh with flag false.
After each sample: true iff the latest three samples are all FAULT.
HEALTHY and UNKNOWN break the run and clear the flag immediately
at that logical step. No latch. A new run requires three new FAULTs.
Missing calls are not UNKNOWN. Physical freshness, duplicate acquisition
and missing-call policies are outside the model.
Malformed-input campaign: unperformed. Other input values are outside
the recorded alphabet. Real startup/restart modes are not modeled.

E. TIMING / TARGET
Start/end physical events, clock, timestamps, period, gaps, jitter,
scheduler, activation, execution and publication deadlines: not modeled.
Physical fault onset, target build/load and operating modes: absent.
Timing/target evidence: unperformed. No duration, FTTI or latency bound.
Host runner elapsed durations are not diagnostic response times.

F. CLAIMS AND EVIDENCE
C1, baseline sequence claim: CONTRADICTED.
T06 expected [false,false,false,false]; actual [false,false,false,true].
Baseline: 7/12 selected; 825/1093 enumerated; child exit 1.
C2, corrected sequence claim: OBSERVED SUPPORT WITHIN DECLARED BOUNDS.
T06 returns four false flags; T10 returns [false,false,true,false].
Corrected: 12/12 selected; 1093/1093 enumerated; child exit 0.
Method: every output flag compared with trailing-window expectations;
literal selected expectations cross-checked against that oracle.
Scope: fresh traces, alphabet above, lengths 0..6 including empty.
Twelve selected traces overlap enumeration; counts are not additive.
Evidence paths relative to:
https://reqproof.com/assets/iso-26262/research-rerun/
captured/baseline/selected-results.json
captured/corrected/selected-results.json
captured/baseline/enumeration-summary.json
captured/corrected/enumeration-summary.json
captured/execution-report.json
captured/baseline/enumeration-observations.jsonl.gz
captured/corrected/enumeration-observations.jsonl.gz
Output hashes: captured/execution-report.json and SHA256SUMS.
Actual wrapper command: python3 -B reproduce.py --output captured.
Provenance: report.wrapper_argv omits interpreter -B;
all four recorded child arrays retain -B.
Currency: applies to the frozen identities above. Reuse for changed
source, requirement, oracle, data, configuration or target is unassessed.

G. RELIANCE AND REVIEW
Tools: recorded CPython, reproduce.py and fixture/run_traces.py.
Reliance: output comparison and expected-contrast checking only.
Potential shared errors: wrong contract interpretation or checker.
Effect: wrong expectations or incomplete comparisons could falsely
support an implementation that violates the contract.
Detection arrangement: separate window formulation and literal cases;
organizational independence and project review approval not established.
Tool-confidence classification/qualification: unperformed.
Project executor, independent reviewer and acceptance roles: unassigned.

H. ANOMALIES AND OPEN WORK
A1: accumulating baseline violates sequence breaks and clearing.
Disposition: retain as counterexample; correction supports C2 only.
Seeded off_by_one and unknown_pauses remain deliberately incorrect.
G1: allocation/ASIL/authority absent; blocks a project safety conclusion.
Proposed closure: actual safety team supplies approved allocation,
adopted basis, assumption owners and decision authority.
G2: target/interface/timing evidence absent; blocks integrated claims.
Proposed closure: define endpoints, quality and scheduling assumptions;
obtain target-appropriate evidence against agreed acceptance criteria.
G3: tool-reliance and required review arrangement unassessed.
Proposed closure: assess intended use and error detection under the
actual adopted basis; retain the responsible authority's disposition.
G4: remaining system safety work and vehicle validation unperformed.
Proposed closure: identify and complete the relevant lifecycle work.
G1-G4 owners, due/review dates and disposition authorities: unassigned,
because this teaching record has no real program. Actions are proposed.

I. DECISION
Narrow finding: corrected agrees with the recorded bounded contract.
Project acceptance: not decided; no approved allocation or authority.
No claim of arbitrary-length proof, structural/MC/DC measurement,
Proof audit, target integration, timing compliance or vehicle safety.
Renewal triggers: changes to rule, source, threshold, reset/quality
policy, oracle, campaign, runtime or proposed application context.

Inspect the complete selected results, download the standalone evidence kit, or follow the reproduction instructions. Preserve the failed baseline when assessing what the correction changed.

Follow the claim through six review steps

Download the complete video transcript.

Read the complete video transcript

This recorded example starts with an authored teaching contract. Every trace begins fresh, with the flag false. Each call supplies FAULT, HEALTHY or UNKNOWN. The flag is true exactly when the latest three samples are FAULT. No vehicle allocation, physical fault or real-time deadline is represented.

The baseline accumulates faults across a broken run. In trace T06, FAULT, HEALTHY, FAULT, FAULT should produce four false flags. The recorded baseline instead raises the final flag. That observation contradicts the consecutive rule even though three faults occurred in total. The distinction is visible in the full output vector.

The corrected implementation uses a consecutive counter, capped at three, and resets on HEALTHY or UNKNOWN. The independent oracle examines trailing windows. For FAULT, FAULT, FAULT, UNKNOWN, the recorded corrected flags are false, false, true, false. UNKNOWN clears the flag at that sample; a missing call is a different situation.

The retained campaign ran four implementations. The correction passed twelve selected traces and all one thousand ninety-three enumerated traces. The selected traces overlap the enumeration, which covers lengths zero through six, including the empty trace. Baseline and seeded alternatives failed as expected; wrapper success records that contrast, without accepting a project.

A logical sample count cannot establish elapsed response time. This fixture has no timestamps, sample period, scheduler, physical fault onset or output deadline. Target timing, integration and vehicle validation were unperformed. The host runner's duration measures host work. It provides no fault-tolerant time interval or detection-latency bound.

For a real change, the proposed next step is to complete the review record. Identify the approved allocation, adopted plan, candidate revisions and input assumptions. Attach current evidence, assign remaining timing and lifecycle gaps, and name the functional-safety decision owner. A bounded software finding can stand while broader acceptance remains unresolved.

Read the text walkthrough

1. Begin with the contract

This recorded example starts with an authored teaching contract. Every trace begins fresh, with the flag false. Each call supplies FAULT, HEALTHY or UNKNOWN. The flag is true exactly when the latest three samples are FAULT. No vehicle allocation, physical fault or real-time deadline is represented.

2. Inspect the sequence break

The baseline accumulates faults across a broken run. In trace T06, FAULT, HEALTHY, FAULT, FAULT should produce four false flags. The recorded baseline instead raises the final flag. That observation contradicts the consecutive rule even though three faults occurred in total. The distinction is visible in the full output vector.

3. Check the correction and oracle

The corrected implementation uses a consecutive counter, capped at three, and resets on HEALTHY or UNKNOWN. The independent oracle examines trailing windows. For FAULT, FAULT, FAULT, UNKNOWN, the recorded corrected flags are false, false, true, false. UNKNOWN clears the flag at that sample; a missing call is a different situation.

4. Preserve the campaign boundary

The retained campaign ran four implementations. The correction passed twelve selected traces and all one thousand ninety-three enumerated traces. The selected traces overlap the enumeration, which covers lengths zero through six, including the empty trace. Baseline and seeded alternatives failed as expected; wrapper success records that contrast, without accepting a project.

5. Keep timing open

A logical sample count cannot establish elapsed response time. This fixture has no timestamps, sample period, scheduler, physical fault onset or output deadline. Target timing, integration and vehicle validation were unperformed. The host runner's duration measures host work. It provides no fault-tolerant time interval or detection-latency bound.

6. Name the next decision

For a real change, the proposed next step is to complete the review record. Identify the approved allocation, adopted plan, candidate revisions and input assumptions. Attach current evidence, assign remaining timing and lifecycle gaps, and name the functional-safety decision owner. A bounded software finding can stand while broader acceptance remains unresolved.

04 / Review in a useful order

How to review one allocated software requirement or change

1. Preserve the allocation before interpreting the code

Open the actual software requirement, parent references and allocation approval. Identify who may clarify the intended behavior and who may accept the change. If the allocation is missing, record that limitation while continuing any useful local analysis. Do not promote an inferred code behavior into an approved safety requirement.

Read the applicable plan and change policy. A requirement wording change, calibration change and scheduler change can have different consequences even when they touch the same function.

2. Make input quality and state transitions explicit

Define what counts as a new sample. Ask whether repeated reads can refer to one acquisition, whether stale data remains eligible, and how UNKNOWN differs from an omitted invocation. Specify startup, restart, reset, clearing, latching and rearming separately.

For a consecutive rule, write both the raising condition and what breaks the run. Have the owner resolve ambiguous quality behavior before generating expected outputs. A check that silently chooses the policy may faithfully verify the wrong agreement.

3. Separate the sample predicate from the timing claim

Write the actual start and end events. Does the interval begin at physical fault onset, acquisition, delivery or processing? Must it end at an internal flag, a published message or an actuator response? Record the allocation supporting that choice.

Then identify clock uncertainty, acquisition delay, freshness, activation, permitted gaps, jitter, execution, communication and consumer scheduling. Explain the target, load and operating modes supporting any bound. A nominal period multiplied by three cannot establish those conditions. An unbounded gap leaves the response-time question unresolved even if the counter is perfect.

4. Follow affected interfaces and evidence dependencies

Inspect the producer that supplies quality and samples, the consumer that interprets the flag, configuration sources and reset ownership. Follow recorded relationships, then investigate plausible unrecorded callers, modes and supplier assumptions.

A correction that clears UNKNOWN may satisfy the local rule while changing what a downstream consumer believes. Preserve that interface question. Link each changed assumption to the claims and evidence that used it, including apparently unchanged tests.

5. Challenge the behavior with a separately justified oracle

Derive expected results from the agreed rule. Select threshold boundaries, interruptions before and after activation, reset paths and relevant input-quality cases. Use a different formulation where useful, as the trailing-window oracle differs from the consecutive counter.

Declare whether the campaign enumerates a finite domain, samples it or checks a modeled property. Record exclusions and overlaps. Preserve raw observations and unsuccessful executions. A complete output vector can expose a transient violation that a final-state assertion misses.

6. Bind the finding to the candidate and decide its reach

Compare requirement, source, configuration, oracle, data, tools and environment identities. Assess whether old evidence remains applicable after this change. Identical source alone does not establish currency if scheduling or input eligibility changed.

Give every remaining gap an owner, closure criterion and review point. Record the narrower supported finding and the broader claims still blocked. Have the designated authority make the actual acceptance decision under the adopted process. A reviewer's technical agreement and a functional-safety acceptance may require different authority.

05 / Check the decision record

A review checklist for allocation, assumptions and evidence

Use this as a practical review aid alongside the adopted plan.

Check / Evidence to see before closing the row
Check Evidence to see before closing the row
Basis Identified plan, edition, scope, change policy and candidate.
Allocation Parent references, rationale, approval and applicable ASIL treatment.
Behavior Exact outputs, thresholds, startup/reset and latch/clear rules.
Input quality Sample eligibility, freshness, duplicates, UNKNOWN and missing calls.
Timing Defined endpoints and justified target, activation, gap and jitter assumptions.
Witness Reviewed oracle, declared campaign, raw observations and counting units.
Currency Matching identities or a recorded, justified reuse decision.
Reliance Named tool uses, error-detection arrangements and required review roles.
Disposition Open anomalies, remaining lifecycle work, owners and authorized decision.

Keep a narrow observed result when another row is open. The checklist is useful because it exposes which conclusion is blocked; turning it into a single compliance percentage would conceal that information.

06 / Avoid misleading support

Mistakes that make a correct counter look like a safety argument

Mistake / Consequence / Correction
Mistake Consequence Correction
Infer ASIL from the word “diagnostic” or a green report The review invents its own safety allocation. Obtain the approved treatment and its rationale.
Convert three samples directly into milliseconds Acquisition phase, gaps and publication delay disappear. Define endpoints and establish the scheduling/target basis.
Treat UNKNOWN as a missing call Quality handling and activation failures become indistinguishable. Specify and examine each situation separately.
Check only whether the flag eventually rises Interrupted runs or incorrect clearing remain hidden. Compare every required intermediate output.
Add selected and enumerated trace counts Reused cases appear to increase the unique input space. Report each campaign and its overlap.
Accept wrapper exit 0 as universal success Expected failures become invisible. Read child verdicts and the wrapper's explicit contract.
Reuse evidence after an assumption change A valid historical result supports the wrong candidate context. Review freshness across behavior, interfaces and configuration.
Treat graph approval as safety acceptance Product permissions silently replace assigned authority. Record the actual functional-safety decision owner and basis.

Ask the reviewer: Which assumption could change while every current unit test still passes? A new producer, changed sampling schedule or different clearing interpretation gives that question practical force.

07 / Keep connected records useful

Use Proof to connect the requirement, evidence and open decision

Proof's Software Intent Graph connects requirements with code, hazards, checks, issues and decisions. Its agent workflow makes recorded context available through MCP. For this task, use those relationships to preserve the allocation references, assumptions, candidate identities and evidence entries from the worksheet.

In an existing configured Proof project, the following are illustrative commands. Replace REQ-ID with the actual requirement identifier. None was executed on this teaching fixture.

proof trace show REQ-ID
proof trace impact REQ-ID --format table
proof trace suspect

trace show displays recorded relationships. trace impact refreshes annotation trace state and traverses those relationships to identify review candidates. trace suspect highlights changes against recorded review fingerprints. These operations help locate work to investigate; they do not execute the requirement's tests or discover every unrecorded dependency. Traceability workflow · Impact workflow

Attach observations to their requirement and candidate basis. A KnownIssue/reproducer workflow needs an actual configured issue, a reproducer contract and an explicit verdict interpretation. Preserve failed evidence and the criterion for closure. A trace-review stamp records review state; it cannot turn an unsupported claim into observed support.

Run the appropriate checks in the repository or CI and retain their outputs. The hosted MCP endpoint answers from stored context and cannot itself start verification. This article's Python kit has no Proof project or Proof audit. Execution boundary

Configure approval permissions to match the project's assigned responsibilities. Proof's public documentation says current initialization templates allow agent approval across its internal assurance levels unless configured differently. Those labels and permissions do not assign ASIL, establish required independence or appoint the functional-safety authority. Approval policy

Proof can help retain the reasoning and expose recorded gaps. The project still owns allocation, lifecycle work, target evidence, tool-reliance assessment and acceptance.

08 / Choose evidence for the claim

Which method and recordkeeping workflow fit this review?

Choose by the unanswered question. The public ISO scopes distinguish software development, system work and supporting processes; the practical choices below apply that distinction without prescribing ASIL-specific methods. Parts 6, 4 and 8

Question / Useful evidence approach / Boundary to preserve
Question Useful evidence approach Boundary to preserve
Is the allocated behavior unambiguous? Requirement, assumption and interface review with the responsible owners. Review does not create an absent allocation approval.
Does the implementation match a sample rule? Assertions against independent expectations; selected traces and bounded enumeration where tractable. Finite behavior agreement does not establish arbitrary histories or timing.
What implementation structure was exercised? Suitable structural analysis or instrumentation under the adopted method. A selected metric cannot establish omitted behavior or an ASIL.
Does the integrated response meet its allocated time? Target-appropriate timing analysis and measurement with explicit endpoints, scheduling and load. A host test duration has a different meaning.
Can the team rely on a tool result? Intended-use, possible-error and detection/review assessment under the adopted process. Tool type or a passing demonstration supplies no classification by itself.

AUTOSAR's R24-11 Diagnostic Event Manager offers a useful external distinction: it names counter-based, time-based and monitor-internal debouncing, and discusses monitor responsibility when status is needed within a specified time. This supports asking who owns the timing argument. It does not supply this fixture's contract or make it a Dem implementation. AUTOSAR, §7.7.3 and §10.2.7.1

A controlled document can hold one bounded review. Repository records suit versioned changes and executable evidence. A requirements platform or Proof can help traverse many connected records. In each workflow, check whether a second reviewer can reach the exact rule, candidate, raw result and unresolved decision. This is a practical selection criterion, not a vendor benchmark.

If the difficulty is one written predicate, use free Spec Lab to propose cases for a fixed window supplied explicitly as three sample positions: true only when all three contain FAULT. Review the interpretation and eligibility assumptions. Spec Lab provides requirement-model planning; it does not execute the counter, model-check temporal behavior, measure timing or verify a vehicle.

09 / Inspect the basis and reproduce the observation

Primary sources and the standalone evidence kit

Standards sources and their roles

These official records support the dated edition/status check and public scope distinctions. Apply the project's adopted documents to its actual obligations.

Source / What it establishes here
Source What it establishes here
ISO 26262-1:2018 Vocabulary and series scope.
ISO 26262-2:2018 Functional-safety management across the lifecycle.
ISO 26262-3:2018 Concept work, including item definition, hazard analysis and the functional safety concept.
ISO 26262-4:2018 System development, integration and safety validation.
ISO 26262-6:2018 Published software-development edition and scope.
ISO 26262-8:2018 Supporting processes, including configuration/change control and confidence in software-tool use.
ISO 26262-9:2018 ASIL-oriented and safety-oriented analyses.
ISO equipment index and separate Part 6 DIS record Published/draft separation and current draft stage.
AUTOSAR R24-11 Diagnostic Event Manager Named debounce approaches and timing responsibility; see printed pages 107 and 543.

Proof's public graph, agents, trust, traceability, impact and Spec Lab pages support the product workflow described above. Product capabilities and the fixture's observations have separate evidence bases.

Read the source and complete observations

README · Contract · Implementation · Oracle · Selected inputs · Runner · Wrapper

Variant / Selected observations / Enumeration summary / Every enumerated observation
Variant Selected observations Enumeration summary Every enumerated observation
Baseline JSON JSON Gzip JSONL
Corrected JSON JSON Gzip JSONL
Off-by-one JSON JSON Gzip JSONL
UNKNOWN-pause JSON JSON Gzip JSONL

The execution report retains source/output hashes, exact child argument arrays, exits and host durations. SHA256SUMS and the ZIP checksum identify the distributed bytes. A hash binds an artifact's identity; it does not establish correctness.

Reproduce without a service dependency

Download the portable ZIP, extract it, and open the directory containing reproduce.py. The kit advertises Python 3.10+ and uses only the standard library. Execution needs no account, network or Proof installation.

python3 -B reproduce.py --output local-rerun

Choose a new output directory; existing destinations are refused. Preserve the captured results and compare your own run's environment, identities, child exits and observations.

The retained capture ran 27 October 2026, 22:39:55.846735–22:39:56.022493 UTC, using CPython 3.14.7, macOS-26.5-arm64-arm-64bit-Mach-O. Its resolved interpreter was /opt/homebrew/opt/python@3.14/bin/python3.14. The advertised minimum was not a multi-version execution campaign.

The actual wrapper command was:

python3 -B reproduce.py --output captured

Provenance detail: the report's wrapper_argv reconstructs that call without the interpreter's -B; all four recorded child arrays include -B. Retain this limitation when comparing commands. The four child exits are 1, 0, 1, 1, in table order. The wrapper's 0 means the expected contrast reproduced with unchanged sources.

The capture performed no malformed-input campaign, structural/MC/DC measurement, formal proof, timing/scheduler measurement, target integration, vehicle validation, ASIL assignment, tool-confidence classification or qualification, or Proof audit. Host elapsed time measures the runner's work, including output writes, and supplies no diagnostic response-time evidence.

10 / Examine two adjacent gaps

Two examples beyond the recorded sequence campaign

A periodic sample still needs a fault-onset reference

Consider a separate hypothetical model with perfectly periodic sampling at 0, 10, 20 and 30 milliseconds, instantaneous acquisition/publication and a fault that persists once it starts. If the fault begins at 1 millisecond, its first three fault samples occur at 10, 20 and 30 milliseconds. The flag appears 29 milliseconds after onset. With onset at 9 milliseconds, the same samples give 21 milliseconds.

These are illustrative calculations, not measurements from the kit. They show why “three samples” does not identify one elapsed detection duration. A real bound also needs acquisition behavior, allowed gaps and jitter, execution, publication and the required response endpoint. The responsible team must connect those assumptions to the allocated timing requirement and any fault-tolerant time interval argument.

Three reads may contain only one fresh acquisition

Suppose an interface change lets a producer repeat its last value when acquisition stops. The consumer receives FAULT on three calls, but all three values carry the same acquisition identity. The teaching predicate sees three FAULT symbols. A real requirement asking for three fresh observations would have a different eligibility condition.

The proposed review should inspect sequence numbers or timestamps, freshness and gap policies, and who reports unavailable quality. Plan separate cases for a repeated stale value, an explicit UNKNOWN sample and a missing invocation. Expected results must come from the approved interface agreement. Changing the counter alone cannot establish that agreement or verify the new producer.

11 / Questions that affect the review

ISO 26262 software evidence questions

Can I review the code before the allocation is available?

Yes. Record a bounded finding against the written behavior you actually have, and mark allocation and authority as missing. Such work can expose defects. It cannot establish conformance to an unidentified allocated safety requirement.

Does the third-edition draft replace Part 6:2018 for my project?

The separate publisher record identifies a draft under development at the dated check. It does not change your adopted plan automatically. Record your actual basis and use its change process to assess any proposed adoption.

Does 1,093/1,093 establish the corrected algorithm for every history?

It establishes agreement over the recorded finite domain: fresh traces of lengths zero through six over three symbols, with every output checked. An arbitrary-length claim needs further justified reasoning or analysis. No such formal proof was performed here.

Should UNKNOWN clear the flag in a real diagnostic function?

That depends on the approved safety and interface requirements. This fixture deliberately clears it. A real system may need a different fault, availability or latching policy. An absent call also needs its own treatment; it is not the UNKNOWN symbol.

Can MC/DC establish ASIL or complete the safety argument?

No. A structural metric examines a declared implementation/testing obligation. It does not supply the allocation, establish requirement adequacy or perform system safety validation. Select applicable methods through the adopted basis and responsible safety process. No structural metric was measured in this fixture.

Does using Python or Proof require a particular tool-confidence classification?

The tool name alone cannot answer that. Identify the version, intended use, relied-upon outputs, possible errors and detection/review arrangements, then apply the adopted process. Part 8 includes confidence in software-tool use. This guide assigns no classification or qualification outcome.

Can the correction be recorded while timing remains unresolved?

Yes. Record the exact supported software finding and keep the integrated timing claim open with an owner and closure criterion. Whether a real change may proceed with that gap is a separate decision for the designated authority.