Illustrative architecture review: a queue is drawn, but its full-queue policy is missing. This exhibit describes a documentary gap and proposed work.

Review item / What the illustration supports or leaves open
Review item What the illustration supports or leaves open
Architecture claim A sensor collector can outpace the persistence component's storage commits. The queue is meant to support required collection within preservation and resource limits.
Documented omission The illustrative design does not settle admission, response or responsibility when the queue fills.
Evidence available The described component relationship; no feasibility analysis, load measurement or recovery result.
Proposed next check Agree the bounds, then examine ordinary collection, saturation with slow or unavailable persistence, and recovery.
Review recommendation Keep this claim open; appoint an owner before relying on it in detailed design.

Status: illustrative documentary gap. Correction and checks are proposed, not implemented or executed. Capacity and throughput are unmeasured; no authorized PDR disposition is supplied. Inspect the proposed review conditions.

01 / Define the decision

What is a preliminary design review?

PDR examines the argument behind the architecture: its requirements, component responsibilities, interfaces, alternatives, feasibility evidence and unresolved risks. It asks whether those support the next design commitment at the maturity your project requires. NASA's Systems Engineering Handbook, NASA/SP-2016-6105 Rev 2, §6.7 describes technical reviews and the supporting decisions, rationale and assumptions to retain.

Keep five questions distinct. Requirements allocation identifies which component or interface must satisfy a requirement. Architecture feasibility explains why the proposed approach can satisfy it within constraints. Verification planning specifies how that claim will be checked. Execution supplies actual observations from performed work. Permission to proceed is the authorized decision under the adopted process. A trace link can support the first question without answering the other four.

Different reviews support different decisions. These summaries follow NASA NPR 7123.1D Change 2, Appendix G, §§G.5, G.7, G.8 and G.11; use your project's adopted definitions and criteria.

Review / Main question
Review Main question
System Requirements Review (SRR) Are the system requirements sufficiently defined and aligned with the mission or intended need?
Preliminary Design Review (PDR) Is the preliminary architecture sufficiently supported to proceed into detailed design?
Critical Design Review (CDR) Is the detailed design mature enough for the applicable implementation, integration and test activities?
Test Readiness Review (TRR) Are the test article, people, facilities, procedures and data arrangements ready for the planned testing?

These are different maturity decisions. A drawing-completion percentage, code-review pass or successful test command cannot stand in for their adopted criteria.

02 / Start with the free record

Free architecture-review starter

Copy this into a review document or issue. Begin with the claim, its requirement, the design reference and one uncertainty. Then complete the evidence, action and decision fields. Use UNKNOWN for missing information and UNASSIGNED for a person who has not been appointed. A proposed role is not an accepted assignment.

This is an original human starter for one architecture thread. It is not a prescribed government form or a complete PDR package.

Blank record

HUMAN ARCHITECTURE REVIEW: ONE PDR CLAIM

1. Project and review basis
Project; review scope; decision being requested:
Adopted plan/contract/source, edition, clause and review criterion:
Applicability and approved tailoring, or UNKNOWN:

2. Architecture claim and requirement
Claim, including its operating conditions:
Requirement/constraint text, source, revision and responsible owner:
Required behavior and relevant loss/resource/response bounds:

3. Candidate design
Document/model/interface reference, revision and relevant location:
Component responsibilities and interface choice being reviewed:

4. Assumption and trade
Assumption on which the claim depends:
Alternatives considered; selection rationale or unresolved choice:

5. Evidence and its limit
Supplied document/analysis/result, reference and applicable revision:
What it supports; assumptions, scope and reuse limits:
Missing evidence; proposed work; any actual performed work:

6. Open risk
Possible consequence and the design decision it affects:

7. Proposed check and closure
Situation to examine; method; observations needed:
Requirement-owned acceptance/closure condition and its source:
Unknown bounds or other prerequisites to resolve first:
Evidence that would support the claim or leave it open:
Status: PROPOSED / PERFORMED, with actual record if performed:

8. Action ownership
Named owner and accepted assignment, or UNASSIGNED:
If unassigned: who obtains appointment, from which project authority:
Due date or review trigger; who reviews closure:

9. Recommendation and authorized decision
Recommendation: proceed / bounded condition / defer affected work:
Scope, condition, rationale and revisit trigger:
Responsible decision authority and basis for that authority:
Actual authorized disposition/reference: NOT RECORDED until made:

Filled illustrative record: collector, queue and persistence

This records the documentary gap introduced above. Project criteria, actual people and controlled document revisions have not been supplied. The proposed action and recommendation remain open.

HUMAN ARCHITECTURE REVIEW: ILLUSTRATIVE COLLECTOR/QUEUE/PERSISTENCE

1. Project and review basis
Project: illustrative sensor collection architecture.
Requested decision: may detailed design rely on the queue's preservation
and resource claim?
Adopted process, source edition, review criterion and tailoring: UNKNOWN.
No NASA or defense process is assumed to govern this illustration.

2. Architecture claim and requirement
Claim for review: buffering lets required collection continue while
preserving the required records within resource and response limits.
Requirement basis: actual preservation and resource constraints must govern.
Source/revision/owner, protected records, permitted loss, operating domain,
resource ceiling and response limits: UNKNOWN; obtain requirement decisions.

3. Candidate design
Described arrangement: sensor collector, intervening queue, persistence.
Controlled design/interface reference and revision: NOT SUPPLIED.
Full-queue admission, producer response and reporting responsibilities:
UNSETTLED in the illustrative description.

4. Assumption and trade
Assumption: buffering can absorb the relevant mismatch and later drain.
Supporting capacity analysis and safe producer-pause capability: UNESTABLISHED.
Options to compare: capacity changes, feasible flow control, or rejection/loss
only where requirements permit. No full-queue policy is selected here.

5. Evidence and its limit
Supplied: the illustrative component relationship and explicit policy omission.
Supports: identifying an unresolved architecture/documentary claim.
Missing: controlled design, justified trade, feasibility evidence and actual
load/recovery observations. Capacity and throughput are unmeasured.
Correction proposed; no implementation change or execution is recorded.

6. Open risk
Unbounded buffering could exhaust resources; discarding could violate
preservation. Blanket stopping could also prevent required collection.
The affected commitment is the collector/storage interface and resource design.

7. Proposed check and closure
First obtain the requirement-owned workload, loss, resource and response
bounds, including what admission and acknowledgment promise.
Review the interface policy and its feasibility argument. Plan observations
of ordinary collection, a full queue with slow/unavailable persistence,
and recovery: record disposition, queue/resources and visible responses.
Closure requires a reviewed policy, justified trade and evidence sufficient
for the adopted PDR criterion, all against the same identified design.
Unknown bounds, unsupported pause assumptions, missing evidence required
at this review or a breach of agreed limits leave the claim open.
Status: PROPOSED / NOT EXECUTED; no correction has been implemented.

8. Action ownership
Owner: UNASSIGNED. Proposed accountable role: architecture/interface lead,
working with requirement and verification owners.
Appointment step: the review lead must identify the project's appointing
authority, request a named owner and record that person's acceptance.
Actual people and accepted appointments: NOT SUPPLIED.
Due/review trigger: appointment and requirement decisions before relying on
the claim; return with the proposed policy/evidence at the next design review.
Closure reviewer: to be named under the adopted review process.

9. Recommendation and authorized decision
Recommendation: defer reliance on this claim for the affected design work.
Reason: preservation, resource limits and overload responsibility are unsettled.
Revisit after the governing bounds, policy and required evidence are available.
Any separately bounded work needs permission under the actual project process.
Responsible decision authority and appointment basis: UNKNOWN; identify them.
Authorized disposition/reference: NOT RECORDED. No approval or risk acceptance.

03 / Inspect the architecture gap

Worked example: settle the full-queue contract

The queue explains where records wait. It does not explain what the collector may do when waiting space runs out, what an acknowledgment promises, or which component reports an inability to preserve a record. Those decisions affect both the interface and the feasibility argument.

The finding is a missing policy and missing support for the architecture claim. It is not an observed implementation defect. The described omission is sufficient to raise a review action; no capacity failure or recovery failure has been measured.

Proposed correction to the design and verification plan

Start with the actual rule: preserve the records the requirement protects, permit loss only to the extent that requirement allows, and respect the resource and response boundaries it sets. The record classes, operating domain and bounds are unknown here. The requirement owner must resolve them before anyone declares a chosen test sufficient.

Document comparison: what is described, and what a proposed revision must add. The right column is uncompleted work, not an implemented repair.

Review subject / Illustrative design as described / Proposed revision
Review subject Illustrative design as described Proposed revision
Governing boundary Preservation and resources matter, but their actual limits are not supplied. Cite the authorized requirement, its operating domain, bounds and admission/acknowledgment meaning.
Interface responsibility A queue joins collector and persistence; full-queue behavior is unsettled. Assign saturation detection, admission, producer response, reporting and recovery responsibilities.
Feasibility and evidence No supporting capacity analysis or load/recovery observation is supplied. Compare alternatives against the same bounds; identify the analysis or prototype evidence needed now and the verification planned later.

Backpressure means asking the producer to slow or stop. Its feasibility is an open architecture question: can this collector respond safely while still meeting its collection obligation? Likewise, extra buffering, increased persistence capacity and permitted rejection or loss each need a justified trade. None is selected merely by naming it.

Proposed next check: saturation and recovery

Before execution, identify the candidate, environment, queue capacity and units, burst pattern and duration, persistence slowdown or outage assumptions, and recovery interval. Obtain the relevant limits from the requirement owner. Values are deliberately unresolved here because no project workload, capacity or loss budget is supplied.

Proposed observation plan, not executed. Each situation below challenges the same preservation/resource claim. The adopted PDR criterion determines which feasibility evidence is needed before proceeding and which later verification remains planned.

Situation to challenge / Observation to obtain / Condition for supporting the claim
Situation to challenge Observation to obtain Condition for supporting the claim
Ordinary collection within the agreed operating domain Offered and admitted records, acknowledgments, committed records, response times and resource use. Required collection succeeds within the agreed bounds. Always stopping or rejecting input cannot substitute for this observation.
The queue reaches its selected limit while persistence commits slowly Queue occupancy and resource use; the collector's response; admission, rejection and reporting at saturation. The chosen policy accounts for affected records and respects the authorized preservation, resource and response limits. A proposed pause needs evidence that the producer can comply.
Persistence is unavailable while the queue is full Treatment of new and buffered records; any acknowledged obligations; loss or refusal reporting. The chosen behavior satisfies the agreed outage and preservation rule. An unknown permissible outage or loss allowance leaves the criterion unresolved.
Persistence returns after saturation Fate of buffered and newly arriving records, return to ordinary collection, resource release and recovery responses. Required records are accounted for and recovery meets its agreed boundary. Apparent draining alone does not establish preservation.

A future observation outside an agreed limit would contradict the claim for that candidate and situation. A missing observation or unknown limit leaves it open. A finite successful campaign would support only its stated conditions; it would not establish universal production correctness.

Proposed review consequence

Recommend deferring reliance on this claim for the affected design work. The omission matters because detailed interface and resource decisions would otherwise inherit an unsettled preservation rule. The next action is to appoint the owner, settle the requirement boundaries and return with a proposed policy and the evidence required at this review's maturity.

A revised interface document could close the documentation omission. Feasibility still needs its own support. The actual authority must determine whether any separately bounded work may proceed under the adopted process; this illustration records no approved condition or accepted residual risk.

Use the starter on one actual architecture claim: identify its missing rule or observation and the condition that would change your recommendation.

Follow the architecture review in six steps

Download the spoken transcript.

Read the narration and on-screen details

1. Start with the decision

On screen

  • One consequential architecture claim
  • Requirement and design revision
  • Adopted criteria and authority
  • Assumption, evidence, next decision

Status: PROPOSED REVIEW METHOD

Narration

A preliminary design review asks whether an architecture has enough support to proceed into detailed design. Start with one consequential claim in your own project. Find its requirement, current design revision and adopted review criteria. Record an assumption, the available evidence, and the decision you need the responsible authority to make.

2. Understand the proposed architecture

On screen

  • Illustrative sensor collector
  • Queue before persistence
  • Bursts can outpace commits
  • Preservation and resource constraints

Status: ILLUSTRATIVE DESIGN

Narration

In this illustrative design, a sensor collector produces records in bursts. A persistence component commits them to storage. A queue holds records between the two when collection runs ahead of commits. The architecture must preserve the records its requirements protect while staying within its permitted resource and response limits.

3. Identify the missing policy

On screen

  • Full-queue policy unspecified
  • Unbounded growth could exhaust resources
  • Discarding could violate preservation
  • Pause feasibility unestablished

Status: ILLUSTRATIVE DOCUMENTARY GAP

Narration

The description does not settle what happens when the queue fills. Unlimited buffering could exhaust resources. Discarding records could violate the preservation rule. Pausing the collector might help, but its feasibility is also unestablished. These are possible consequences of a missing policy, not observations from a running system.

4. Specify the next evidence

On screen

  • Ordinary collection remains required
  • Queue full; persistence slow or unavailable
  • Recovery and record disposition
  • Requirement bounds still unknown

Status: PROPOSED CHECK / NOT EXECUTED

Narration

The proposed check includes ordinary permitted collection, a full queue while persistence is slow or unavailable, and recovery when commits resume. Observe what happens to incoming and buffered records, resource use and responses. First obtain the actual workload, loss, resource and response boundaries from the requirement owner. Unknown limits prevent a sufficient acceptance criterion.

5. Give the action an owner

On screen

  • Proposed interface responsibilities
  • Alternatives need feasibility evidence
  • Action owner unassigned
  • Appointment and review point pending

Status: PROPOSED CORRECTION / NOT IMPLEMENTED

Narration

Propose an interface revision that assigns admission, saturation handling, reporting and recovery responsibilities. Compare feasible options before choosing one; do not assume the collector can pause safely. If the action has no owner, the review lead must obtain an appointment from the project's responsible authority and record a due or review point.

6. Keep the recommendation separate

On screen

  • Architecture claim remains open
  • No load or recovery result
  • Recommendation: defer reliance on claim
  • Authorized PDR disposition not supplied

Status: ILLUSTRATIVE RECOMMENDATION / NO AUTHORIZED DECISION

Narration

The result here is an open architecture claim and a proposed next action. No load or recovery check has run, no repair has been implemented, and no PDR approval is recorded. Recommend deferring reliance on this claim until the required support exists. The project's adopted process governs any permission to proceed.

04 / Perform the review in order

How to review one architecture claim

  1. Locate the governing basis. Identify the adopted plan, source edition, entrance and success criteria, completion rules and decision authority. If any is unknown, assign its resolution while continuing the useful technical inspection.
  2. Choose a consequential claim. Prefer a choice whose failure would change an interface, resource commitment, safety argument, cost or schedule. Link the requirement and constraint to the current design location and revision.
  3. Challenge the design argument. Inspect component responsibility, exceptional states, alternative choices and assumptions. Ask which assumption could make the selected architecture infeasible.
  4. Assess the supplied support. Separate reviewed documents, analyses and actual observations from planned work. Check whether each item applies to this candidate and operating domain; explain any proposed reuse.
  5. Turn the gap into an action. Specify the question, method, required observation or decision, closure condition, owner and due/review point. Obtain missing requirement bounds before treating an execution plan as sufficient. Use the worksheet's appointment step for an unassigned action.
  6. Request and retain the disposition. Explain the consequence for the affected work. Record the authority's actual decision separately from your recommendation, including scope, conditions and revisit triggers. Keep the item open until its required closure is recorded.

05 / Check the handoff

PDR checklist for this first review

  • The adopted criterion, source edition and decision authority are identifiable, or their absence is an owned gap.
  • The claim names a requirement, operating conditions and candidate design revision.
  • Interface responsibilities and consequential assumptions are visible.
  • Evidence supports the claim at the required maturity; missing or stale support stays visible.
  • The next check has an observable closure condition and requirement-owned bounds.
  • Required ordinary operation remains part of the acceptance basis.
  • An owner has accepted the action, or appointment remains explicitly open.
  • The recommendation and any authorized disposition have separate records.

06 / Avoid misleading closure

Common preliminary design review mistakes

Review errors that can survive a polished presentation.

Mistake / Why it matters / Correction
Mistake Why it matters Correction
Use a supplier's favorable benchmark as the project requirement A measurement under another workload can silently become the acceptance target. Establish the required operating domain and bounds independently, then assess relevant evidence.
Count requirement links without examining their allocation Every requirement can have a link while the disputed interface responsibility remains unassigned. Inspect what each component actually undertakes to do, including exceptional states.
Treat a proposed design change as completed mitigation Editing a plan can make a risk look closed without supporting the new behavior. Record document approval, implementation, evidence and risk disposition separately.
Quietly weaken preservation to fit the chosen queue The architecture appears adequate only because the promise changed. Submit the requirement change to its authorized owner and reassess its consequences.
Hide unresolved trades in presentation backup material Reviewers can miss the assumption on which a costly commitment depends. Put the affected claim, consequence and required decision beside the proposed design.

07 / Use Proof where it fits

Proof as review preparation

Proof helps maintain project intent and inspect connected evidence.

For a configured project, Proof's PDR assessment checks configured structural, document, interface, dependency and requirement relationships. Inspect the referenced material and revision behind an observation before bringing it to the review. A declared relationship, generated document or cycle-free dependency graph is supporting information.

Those checks do not establish throughput, overload or recovery correctness, adequate architecture trades, government entrance or exit criteria, or an authorized PDR disposition. No Proof assessment was run for this illustration. Your team designs and builds; the project's responsible authority decides whether the evidence supports proceeding.

08 / Choose evidence for the uncertainty

Which method should you use next?

Select the method that could change the pending architecture decision. The choices below adapt the emphasis on interfaces, trades, analysis and feasibility evidence in NASA NPR 7123.1D Change 2, Table G-6 and the September 2026 Systems Engineering Guidebook, Table 5-4.

Method choices for a preliminary architecture claim.

Uncertainty / Useful next method / Evidence boundary
Uncertainty Useful next method Evidence boundary
The required behavior or interface owner is unsettled Review the requirement and interface agreement with the responsible owners. Can settle the documented obligation; cannot supply measured performance.
Capacity depends on workload and service assumptions Compare alternatives using an explicit capacity/resource analysis and margins. Supports conclusions under those assumptions; a calculated value is not measured capacity.
A sequence of component responses may be inconsistent Review a state/interaction model, including exceptional and recovery states, with both sides of the interface. Model results depend on the modeled rules and assumptions. Producer behavior still needs justification.
Feasibility depends on implementation or environment behavior Plan a focused prototype or controlled load/recovery check on a relevant setup. Retain actual observations and environment limits. A successful finite check supports its tested scope.

If the dispute is over the required loss boundary, resolve that decision first. More measurements cannot choose the requirement owner’s policy. If existing evidence already answers the scoped question, assess its applicability before commissioning another experiment.

09 / Inspect the actual review basis

Primary sources, editions and applicability

Start with the project's contract, approved review plan and adopted criteria. Record the source title, edition, clause, applicability and approved tailoring. Then identify who may interpret the requirement, accept a change and authorize the next activity. An access date identifies when someone inspected a page; it does not identify the source edition.

Primary source map: purpose, edition and boundary.

Source / What to inspect / Applicability and limit
Source What to inspect Applicability and limit
NASA NPR 7123.1D, updated with Change 2. Effective 5 July 2023; Change 2 approved 20 February 2024. Preface P.2, Chapter 5 and Appendix G. Applies to NASA organizations, staff and support contractors using NASA processes. JPL and other covered parties are included only as specified or referenced in the relevant contracts, grants or agreements.
NASA Systems Engineering Handbook, NASA/SP-2016-6105 Rev 2. §6.7, especially §§6.7.1.2.2–6.7.1.3 and Table 6.7-1, printed pp.159–162. Explanatory guidance. Its review table describes spaceflight projects.
Systems Engineering Guidebook, September 2026, Office of Systems Engineering and Architecture. §§5.1, 5.2 and 5.6; Table 5-4. §5.2 is printed p.58/PDF p.68; PDR criteria begin at printed p.71/PDF p.81. Defense acquisition guidance, currently linked by the official policy library. Identify the program's adopted Systems Engineering Plan (SEP) and criteria.
DoDI 5000.88, Engineering of Defense Systems, effective 18 November 2020. §§1.1–1.2 and §3.5.a, especially the review/equivalent and SEP-waiver provisions. Policy for the stated DoD Components, with pathway tailoring. Detailed guidebook criteria have a separate role; establish actual program and contractual obligations.
NASA Software Engineering Handbook, NASA-HDBK-2203, Version D, Topic 7.09. Current topic entry and §7, PDR, in its software-review context. Online guidance to tailor. Distinguish handbook version from individual page history; do not transplant example thresholds into unrelated projects.

NASA products, criteria and baseline timing

For applicable NASA projects, NPR 7123.1D Change 2, §5.2.2.2.d specifies minimum PDR products: the preliminary design solution definition (SE-45), baselined integration plans (SE-67) and a baselined Verification and Validation Plan (SE-68). Section 5.2.2.4 explains the timing: at least final drafts enter the review; formal baselining follows incorporation of approved review comments and actions.

Appendix G, §§G.1.1–G.1.4 supplies recommended, customizable criteria and does not list every required product. That status does not erase the separate mandatory product requirements within applicability. This starter does not replace them.

Keep each source's completion rules intact

NASA: among its completion conditions, §5.2.3.1 requires agreement on dispositions, controls that follow actions to closure, and a decision memo signed by the Program/Project Decision Authority. It permits agreed, timely plans for specified unresolved matters. An informal promise to investigate is insufficient.

Defense guide, September 2026: §5.2 calls for criteria to be achieved and action items closed before review completion. The §5.6/Table 5-4 preamble says system PDR should not begin until the identified SEP criteria are met and prior technical reviews and their actions are complete. Apply that program's process rather than importing NASA's closure-plan provisions.

The example, starter and proposed checks are original engineering aids. They establish no compliance, certification or government approval.

10 / Apply the record to another uncertainty

Two more architecture-review examples

1. Two components agree on a field name but disagree on its meaning

Illustrative review situation; no execution reported. A producer describes a timestamp as the instant it collected a sample. A consumer's design treats that field as the instant the sample entered storage. Both components can reference the same interface while making incompatible assumptions about the requirement they satisfy.

The next action is an interface decision with both owners: identify the required event, time basis, units and conversion responsibility. Closure needs an agreed, controlled definition and a plan to verify the relevant behavior. Until then, a test generated from either side's assumption could simply preserve the disagreement. The affected interface commitment remains open; this does not decide unrelated architecture work.

2. A changed deployment invalidates one assumption in an old analysis

Illustrative evidence-reuse question; no measurements reported. A previous architecture analysis assumes two components communicate locally. The candidate now places them across a network connection whose delay and availability constraints have not been assessed. The code can be unchanged while the feasibility argument changes.

Identify which conclusions depend on the local connection, then assign the missing analysis or targeted integration evidence for the candidate deployment. Preserve unaffected evidence only with a justified applicability assessment. The decision authority can consider separately supported work under the adopted process while the changed interaction remains open. A complete restart of every verification activity is not implied.

11 / Resolve the remaining questions

Preliminary design review questions, answered

Must production code exist before PDR?

Use the maturity and evidence your adopted criteria require. Preliminary design can be supported by requirements, interfaces, trades, analyses and relevant prototypes. Implementation-dependent uncertainties may need targeted execution before a particular commitment. PDR does not universally require completion of all later verification. The NASA minimum products and defense criteria show why planning and performed evidence must be distinguished.

Can existing analysis be enough, or must we run a new experiment?

Existing analysis can be useful if its assumptions, candidate and operating domain support the claim at the required maturity. Inspect that connection. A new experiment is warranted when a consequential uncertainty depends on behavior the available evidence does not establish. Completing this worksheet does not itself create a need to run a load test.

What if reviewers disagree about what the requirement permits?

Record the competing interpretations and the design consequence of each. Obtain a decision from the person authorized to resolve that requirement, then update the design and verification basis. A majority vote among design authors or a favorable test result cannot silently choose a different preservation promise.

Does AI-assisted design change this review task?

Review the actual requirement, architecture and evidence under the same adopted basis. An assistant can help organize supplied material or propose questions, but its explanation cannot supply missing measurements or authority. Challenge assumptions repeated across generated diagrams, plans and tests.