Review point / Described clamping path / Proposed path preserving the invalid sample
Review point Described clamping path Proposed path preserving the invalid sample
Out-of-range sample requested by the script 120 °C 120 °C
Fixture transformation Clamps 120 °C to the allowed upper value, 100 °C. Would preserve 120 °C through a justified mode or injection point; availability is unknown.
Value at the application boundary The description implies 100 °C would arrive. Delivery of 120 °C would need to be observed.
Meaning of the application response Handling an allowed 100 °C cannot establish rejection of 120 °C. No response is recorded. If 120 °C arrives, the teaching rule requires an out-of-range indication and the stored 20 °C to remain unchanged.
Evidence status Documentary illustration; actual delivery and response unrecorded. PROPOSED, UNIMPLEMENTED and NOT EXECUTED.

Follow the proposed observations and filled record.

01 / Define the decision

What is a test readiness review?

A TRR examines whether the planned test can answer its stated question with usable evidence. NASA's description includes readiness of the test article, facilities, personnel, procedures and data handling. Its Appendix G criteria are recommended and customized guidance within NASA's applicable requirements, not universal rules for every software team. NPR 7123.1D, G.1 and G.11.

A campaign review also covers objectives, configuration, procedures and expected results, resources, safety/security, data handling, discrepancies, contingencies and authority. The case review in this guide contributes one thread to that broader decision.

Which review or record answers your question? These distinctions concern the decision being supported, not a requirement to create separate documents.

Review or record / Question it addresses
Review or record Question it addresses
Preliminary design review (PDR) Can the proposed architecture meet requirements within the constraints well enough to proceed into detailed design?
Critical design review (CDR) Is the detailed design mature enough for the next implementation, integration or test commitment under the adopted process?
Test readiness review (TRR) Can the identified planned campaign produce interpretable evidence, and what execution scope and conditions should be considered for authorization?
Automated product or CI gate Do the configured checks satisfy the configured policy for the supplied project evidence?
Test-results or verification report What was actually performed, which data are usable, what behavior was observed and what remains unresolved?
Release or acceptance decision Is the available evidence sufficient for the intended delivery or use under the applicable authority?

The PDR, CDR and verification-report guides develop those neighboring tasks.

Keep five conclusions separate in the record: readiness support from reviewed material; actual authorization with scope and conditions; execution and data validity from performed work; behavior assessment against the requirement; and release or acceptance under its governing process. Evidence for one does not automatically supply the next.

02 / Start with the free record

Copy a human first-review record

Copy this original engineering starter into an issue or review record. Fill it from your plan and setup, referencing existing controlled material. Use UNKNOWN for missing facts, UNASSIGNED for missing appointments and NOT APPLICABLE with a reason where justified.

The record supports one consequential case or claimed boundary within its campaign. It is not an official whole-program package or an AI prompt. The source basis for its fields is explained under primary sources.

HUMAN TEST-READINESS FIRST REVIEW

1. Scope, basis and intended decision
Campaign name/identity and objective:
Selected case, claimed boundary and consequential requirement:
Candidate execution scope proposed; exclusions and their owning plan:
Adopted plan/procedure/criterion, revision or edition, and applicability:
Approved tailoring, conditions and required prior evidence:
Intended execution authority and governing decision process:

2. Requirement and expected behavior
Requirement/oracle source, identity, revision and approval status:
Allowed range, inclusive/exclusive bounds, units and representation:
Initial state, relevant timing and completion point:
Expected valid-input response and state/effects:
Expected invalid-input response and state/effects:
Unknown or disputed intent and who must resolve it:

3. Candidate, setup and input path
Candidate/build, dependencies and relevant configuration identities:
Fixture, instruments, software/configuration revisions and environment:
Injection point; transformations up to the claimed boundary:
Relevant instrument range/accuracy/calibration or qualification support:
Differences from the claimed operating path and their justification:

4. Proposed observations and controls
Normal valid-input control and consequential invalid stimulus:
Where/how actual delivery at the claimed boundary will be captured:
Where/how response and relevant before/after state will be captured:
How both observations will be correlated to the same attempt:
Capture configuration, transformations, limitations and effects on the path:
Oracle comparison; plausible wrong result it must distinguish:
Missing/corrupt/uncorrelated data rule and retained evidence location:
Status of each proposed check; do not label a plan as executed:

5. Available support and readiness gap
Material actually available, its identity/location and relevant scope:
Evidence type: description / inspection / recorded preparation or execution:
What it supports; what remains unestablished or conflicts:
Documentary gap and exact case/claim affected:

6. Proposed closure
Smallest next check, its prerequisites and proposed responsible role:
Setup/procedure change proposed; current implementation status:
Closure evidence required, reviewer and completion criterion:
Evidence still needed for the wider campaign:

7. People and operating conditions
Requirement owner; setup owner; executor; reviewer, or UNASSIGNED:
Test director/stop authority and data/anomaly decision owner as applicable:
Resources, permissions, safety/security, stop/recovery and data controls:
Open discrepancies, accepted conditions and their actual authority:

8. Recommendation and actual disposition
Reviewer recommendation; affected scope and conditions:
Action owner/appointment needed; next review point:
Reopen triggers, including relevant baseline or observation changes:
Actual authorized disposition, authority, scope, conditions and record:
  Use UNRECORDED when no decision is supplied.
Later execution/data validity and behavior assessment:
Separate release/acceptance status or applicable decision reference:

03 / Inspect the readiness gap

The fixture prevents the planned invalid-input challenge

Under the illustrative rule, 120 °C must reach the application's range check before its out-of-range response can be assessed. The described fixture would substitute 100 °C. A normal response to that allowed value would not answer the rejection question. No such response, failed run or application defect has been observed here.

The finding is a documentary readiness gap for the intended invalid-input case. A script containing an invalid value, a test name or a fixture-generated check mark does not resolve it.

Propose a path without changing the requirement

A controlled fixture mode that preserves the sample, or an alternate injection point before application validation, could address this gap. Both are proposed options; neither is an established capability or implemented repair. Retain the application's required validation and state handling. If a clamp serves a legitimate safety or control requirement elsewhere, preserve that protection and justify any difference in the test path under the adopted process.

Application-boundary injection could support this bounded application case while leaving sensor/driver behavior, timing and other end-to-end claims unresolved.

Plan delivery and response observations together

Propose a receiver-side capture of the decoded sample immediately before range validation, paired with the application's response and its last accepted measurement before and after handling. Correlate those observations to the same attempt using a recorded attempt identifier and ordered input/completion events. The real capture hooks, completion signal and correlation capability are unknown and must be established before use.

Document conversions between the capture point and validation, capture configuration, loss or buffering limits, and whether instrumentation changes the candidate or timing. An assertion calculated from the fixture's own clamp settings repeats the assumption; it does not independently show what arrived. Missing, corrupt or uncorrelated observations leave the affected behavior assessment inconclusive.

Proposed case comparison, NOT EXECUTED. All temperatures and expected outcomes are illustrative. Each case begins separately with 20 °C as the last accepted measurement; observe state when that sample's handling completes.

Planned case / Delivery observation required / Correlated response/state required by the teaching rule / Plausible misleading or wrong result
Planned case Delivery observation required Correlated response/state required by the teaching rule Plausible misleading or wrong result
Ordinary valid-input control Establish that 25 °C reached the same application boundary. Accepted indication; last accepted measurement becomes 25 °C. Rejecting everything could satisfy a rejection-only check while preventing required normal work.
Out-of-range sample Establish that 120 °C reached that boundary without being clamped. Out-of-range indication; last accepted measurement remains 20 °C. If delivery of 120 °C and usable correlated evidence are established, accepting it or replacing the stored measurement violates this teaching rule. If only 100 °C arrives, the invalid-input claim was not challenged.

These controls address this claim; they do not form a complete boundary suite. A preparation path check needs its own authorization and retained evidence before being marked complete. If it exposes a wrong application response, distinguish that valid failure observation from an inability to test. Its effect on further readiness depends on the campaign objective and adopted criteria.

Filled illustrative first-review record

This filled documentary review preserves real-project unknowns and labels the teaching rule and proposed checks. Actual permission to execute is UNRECORDED.

HUMAN TEST-READINESS FIRST REVIEW: ILLUSTRATIVE SENSOR CASE

1. Scope, basis and intended decision
Campaign context: sensor-input handling; real campaign identity UNKNOWN.
Selected claim: application handling of an out-of-range decoded temperature.
Intended scope: one invalid-input case with a normal valid-input control.
Boundary: decoded application input immediately before its range validation.
Excluded: physical sensing accuracy, full sensor/driver chain, timing and
other campaign cases. Their owning plans are UNKNOWN.
Adopted plan/procedure/criterion, editions, tailoring and required prior
evidence: UNKNOWN. Execution authority and governing process: UNKNOWN.
Informative references only: NASA NPR 7123.1D Updated w/Change 2,
G.1/G.11/Table G-10; NASA/SP-2016-6105 Rev 2, Table 5.3-1.
These are not established as the unidentified project's adopted criteria.

2. Requirement and expected behavior
Real requirement/oracle identity, revision, approval and response encoding:
UNKNOWN. Real bounds, units, representation and completion rule: UNKNOWN.
ILLUSTRATIVE rule: signed integer samples in whole degrees Celsius;
0 through 100 inclusive is valid. For a valid sample, report accepted and
store it as the last accepted measurement. Outside that range, indicate out of range and
leave the last accepted measurement unchanged.
ILLUSTRATIVE initial state: 20 degrees Celsius, separately for each case.
Control: 25 degrees delivered; expect accepted and stored value 25.
Invalid case: 120 degrees delivered; expect out of range and stored value 20.
Expected state is assessed at completion of the selected sample's handling.
Confirm the real requirement and oracle with an owner; appointment UNASSIGNED.

3. Candidate, setup and input path
Actual candidate/build, dependencies, fixture, instruments, configuration
revisions and environment: UNKNOWN. Calibration/qualification support and
relevant instrument limits: UNKNOWN; no such status is established.
Described path: script requests an invalid measurement; fixture clamps it
into the valid range before application delivery.
ILLUSTRATIVE consequence: request 120 degrees; described clamp would deliver
100 degrees. This is an inference from a description, not a measurement.
Other conversions and actual observation points: UNKNOWN.
Proposed preserving mode or alternate injection: availability UNKNOWN;
UNIMPLEMENTED. Application injection would exclude upstream chain claims.

4. Proposed observations and controls
PROPOSED receiver-side capture of the decoded value before validation;
separate capture of response and last accepted measurement before/after
handling. Correlate attempt identifier and ordered input/completion events.
Actual hooks, correlation capability, capture configuration, transformations,
data retention location and instrumentation effects: UNKNOWN.
Do not infer received input from the fixture's clamp configuration.
Plan the 25-degree normal control and 120-degree invalid case above.
Reject-everything must fail the normal control. Acceptance or a changed
last accepted value after confirmed delivery of 120 violates the teaching rule.
Delivery of clamped 100 does not challenge invalid-input handling.
Missing/corrupt/uncorrelated observations: no behavior verdict from that data;
data/anomaly owner to apply the adopted procedure, currently UNASSIGNED.
All proposed path checks and application cases: NOT EXECUTED.

5. Available support and readiness gap
Available material: this guide's described sensor-fixture path and explicit
teaching rule, under "Does the invalid measurement reach the application?"
Evidence type: documentary illustration. No implementation, actual input
reading, application response, executed correction or retest is supplied.
Finding: the described setup does not establish readiness of the intended
invalid-input case because it removes that condition before the claimed boundary.
Application behavior: UNKNOWN. Historical AI use: UNKNOWN.

6. Proposed closure
First confirm the real requirement, boundary and candidate/setup identities;
inspect the actual path with the setup owner. Then select and document a
justified preserving path and paired observation procedure.
Proposed roles: requirement owner, setup owner and test lead; all UNASSIGNED.
Prerequisites: agreed oracle, available suitable setup/capture, relevant
permissions and safety controls. No preparation execution is authorized here.
Closure evidence: reviewed requirement and setup/procedure identities,
justified path and capture effects, retained delivery/response/state evidence
from any required authorized path check, and disposition of remaining limits.
Reviewer appointment: UNASSIGNED. A rewritten procedure alone is not closure.
Wider campaign: remaining objectives/resources/risks and governing decision
still require their own readiness assessment.

7. People and operating conditions
Requirement owner, setup owner, executor and reviewer: UNASSIGNED.
Test director/stop authority and data/anomaly owner: UNASSIGNED.
Resources, permissions, physical safe limits, security, stop/recovery and
data controls: UNKNOWN. Resolve those relevant to the selected setup.
Other discrepancies and accepted conditions: UNKNOWN; none accepted here.

8. Recommendation and actual disposition
ILLUSTRATIVE REVIEWER RECOMMENDATION: defer this invalid-input case's
readiness conclusion pending the closure evidence above.
Action owners: UNASSIGNED. Review point: after that evidence is available,
before seeking authorization for the affected execution scope.
Reopen on changes to requirement, candidate, fixture, conversion, injection,
capture or oracle, or discovery of lost/misattributed observations.
Actual authorization/disposition, authority, scope and conditions: UNRECORDED.
This is not an authorized hold, a failed TRR or permission for other cases.
Later execution/data validity: NOT EXECUTED / NOT ASSESSED.
Behavior assessment: UNKNOWN. Release/acceptance: UNRECORDED, outside this review.

Apply this to your case: inspect the actual setup, trace its input transformations, and put the proposed delivery observation beside the proposed response/state observation. Use the blank record to assign the smallest missing check before the campaign runs.

Follow the readiness review in six steps

Download the spoken transcript.

Read the narration and on-screen details

1. Choose the case

On screen

  • One sensor-input campaign
  • One consequential case
  • Candidate and setup: UNKNOWN
  • Document review; no execution

Status: ILLUSTRATIVE DOCUMENT REVIEW; NOT EXECUTED; real identities UNKNOWN

Narration

A test lead is preparing a sensor-input campaign. Start the readiness review with one consequential case, its requirement, candidate and setup. Ask whether the planned condition can reach the boundary being claimed and whether the observations can answer the requirement. This illustration reviews a description; no test has run.

2. State the teaching rule

On screen

  • ILLUSTRATIVE signed integer °C
  • Allowed: 0 through 100 inclusive
  • Valid: accepted and stored
  • Invalid: out of range; state unchanged

Status: ILLUSTRATIVE RULE; actual requirement and oracle UNKNOWN; NOT EXECUTED

Narration

For teaching only, suppose the application accepts signed integer temperatures from zero through one hundred degrees Celsius, inclusive. For an allowed sample, it reports acceptance and stores the sample as the last accepted measurement. An out-of-range sample must produce an out-of-range indication and leave that measurement unchanged. The real project's rule and identities remain unknown.

3. Follow the transformed sample

On screen

  • Script requests 120 °C
  • Fixture would clamp to 100 °C
  • 100 °C is an allowed value
  • Actual application response: UNKNOWN

Status: ILLUSTRATIVE DESCRIBED PATH; no recorded delivery or response; NOT EXECUTED

Narration

The script requests one hundred twenty degrees. The described fixture clamps it to one hundred before the application's input boundary. That is an allowed value under the illustrative rule. Handling that value cannot establish rejection of the requested invalid sample. No application response or instrument reading is recorded.

4. Pair the observations

On screen

  • PROPOSED capture before validation
  • Pair response and before/after state
  • Correlate the same attempt
  • Capture capability and effects: UNKNOWN

Status: PROPOSED OBSERVATIONS; capture capability UNKNOWN; NOT EXECUTED

Narration

Propose paired observations: capture the delivered value immediately before application validation, then correlate it with the response and accepted measurement before and after handling. Use the same attempt identifier and inspect the capture method's effects. A value alone cannot prove rejection; a response alone cannot establish what arrived.

5. Preserve normal handling

On screen

  • ILLUSTRATIVE °C; initial 20 each
  • Expect 25 accepted; store 25
  • Expect 120 out of range; retain 20
  • Proposed path; checks NOT EXECUTED

Status: ILLUSTRATIVE EXPECTATIONS; proposed path UNIMPLEMENTED; all checks NOT EXECUTED

Narration

Retain a valid-input control. Starting separately from twenty degrees, twenty-five should be accepted and stored; one hundred twenty should be rejected while twenty remains stored. These are illustrative expectations, not results. A value-preserving fixture mode or controlled injection point is only proposed, and must preserve required validation and protections.

6. Keep the decision scoped

On screen

  • Case readiness not established
  • Reviewer recommends scoped deferral
  • Responsible appointments: UNASSIGNED
  • Actual authorization: UNRECORDED

Status: ILLUSTRATIVE REVIEWER RECOMMENDATION; checks NOT EXECUTED; authority UNRECORDED

Narration

Recommend deferring the affected invalid-input case until the real rule, justified path and paired observations have reviewable support. Every proposed check remains unexecuted. Owners are unassigned and actual authorization is unrecorded. Application-boundary injection leaves the sensor and driver chain unresolved; the rest of the campaign still needs its own governing decision.

04 / Review your own planned test

Perform the first review in order

  1. Name the commitment. Identify the campaign, consequential case, candidate and execution boundary. Locate the adopted plan, criteria, editions, required prior evidence and actual decision authority.
  2. Fix the expected behavior. Record the requirement, units, representation, bounds, initial state and relevant effects. Resolve disputed expectations with the requirement owner before treating them as an oracle.
  3. Trace the stimulus. Follow injection, scaling, filtering, clamping, serialization and driver handling to the claimed boundary. Use the actual setup/configuration description; mark any unknown transformation.
  4. Design the observation pair. Identify how delivered input and correlated response/state will be captured. Include an appropriate valid control and a plausible wrong result. Assess observer effects, data loss and differences from the intended environment.
  5. Compare with available support. Inspect actual documents and any applicable prior records. Identify what supports the plan, what is missing and what contradicts it. A procedure or evidence link alone does not establish execution.
  6. Assign closure and seek the scoped decision. Give each material gap an owner, required evidence and review point. Record the recommendation separately from actual permission, its conditions and scope. Preserve the basis for later results and reopen it when relevant inputs change.

The NASA verification preparation guidance supports this attention to procedures, enabling resources and tailored readiness reviews. The ordering above is an engineering starter, not an official mandated sequence.

05 / Check the handoff

Readiness checklist and exit record

  • The intended execution scope and governing criteria are identifiable.
  • The requirement, valid/invalid behavior and oracle are agreed or explicitly unresolved.
  • Candidate, setup, transformations and relevant configuration are identified.
  • The setup can support the required stimulus and paired observations, with limits addressed.
  • Necessary controls, resources, people, safety/security and contingencies are covered.
  • Data correlation, retention and anomaly handling have an accountable owner.
  • Required prior evidence and known discrepancies have the disposition the actual criteria require.
  • The exit record distinguishes recommendation from authorized scope, conditions, actions and review triggers.

At exit, retain the actual authority, disposition, configuration, cases, conditions and closure actions. Without that decision, record UNRECORDED.

06 / Repair misleading readiness claims

Mistakes that survive a completed checklist

Different ways an apparently prepared test can lose its meaning. Each repair concerns the affected claim and adopted process.

Mistake / Why it misleads / Repair
Mistake Why it misleads Repair
Change the expected result to match the fixture The test stops challenging the original requirement. Preserve the requirement; obtain an authorized change if the intended behavior really changes.
Treat a calibration label as proof of the digital path Measurement suitability does not establish conversions, clamping or routing. Inspect relevant logic/configuration as well as required metrology support.
Trust agreement between generated procedures and generated expectations Both can repeat the assumption that requested input equals received input. Derive the oracle from agreed intent and require boundary evidence.
Mark missing or corrupt data as an application failure There may be no interpretable behavior observation. Record the data problem and let the assigned owner determine the affected evidence's validity.
Remove an inconvenient case without disposition The campaign appears complete because a requirement disappeared. Record the excluded claim, consequence, responsible owner and governing decision.
Reuse a readiness decision after changing the setup Its basis may no longer describe the planned test. Review the changed path and affected observations before reuse.

07 / Use Proof within its scope

Keep configured checks and the readiness decision connected

In a configured project, Proof's TRR assessment can inspect configured tests, coverage/MC/DC, formal-evidence and trace relationships under the project's policy. Use the underlying artifacts to locate gaps and connect them to the requirement, candidate and responsible action. No Proof command ran for this illustration.

That assessment cannot establish that an external fixture delivered the required condition, supply qualified or calibrated instrumentation, establish all behavior, or grant government, test or release authorization. Keep those obligations with the appropriate evidence and authority.

08 / Choose a method for the missing support

Which next check answers the readiness question?

Choose the method after identifying the uncertainty. These are practical choices, not a product benchmark or a requirement to perform every method.

Uncertainty / Useful next method / What it leaves unresolved
Uncertainty Useful next method What it leaves unresolved
The behavior or scope is disputed Review the requirement, plan and oracle with their owners. NASA Topic 5.10 describes planning the conditions and environment. An agreed expectation does not supply implementation observations.
The fixture may transform the stimulus Inspect configuration and the input path, then plan an authorized path check with paired observations. NASA Table 5.3-1 provides procedure/observation examples. Inspection alone cannot establish an actual delivered sample or response.
The claim includes the sensor/driver chain or timing Plan representative integrated stimulation and suitable capture, with ranges, tolerances and configuration differences justified. NASA verification preparation. A convenient application injection or intrusive observer may not represent that claim.
A governing criterion requires structural coverage Use supported instrumentation and inspect its measured obligations alongside requirement assertions. See the MC/DC guide. Coverage cannot establish external stimulus delivery, complete requirements or execution authority.

09 / Inspect the basis

Primary sources and what they support

Use the edition and criteria adopted by your project, with applicable changes and tailoring.

Primary source and locator / Use and limit
Primary source and locator Use and limit
NASA NPR 7123.1D, Updated w/Change 2, effective 5 July 2023; Change 2 approved 20 February 2024. P.2; G.1; G.11/Table G-10, pp. 92–94. Applicability, customized review criteria and readiness of article, facilities, people, procedures and data. Appendix G recommendations are distinct from separately applicable requirements.
NASA Software Engineering Handbook, Version D, Topic 7.09, introduction and §11; PAT-075 checklist, attachment version 6. Tailored software review guidance. Numerical, IV&V and Synthetic Intelligence entries do not become universal criteria or generic coding-assistant mandates.
NASA Software Engineering Handbook, Version D, Topic 5.10, §§1.1–1.2, 10, 12 and 13. Plan maturity: preliminary draft at PDR, baseline at CDR exit, complete/final plan by TRR exit. Also data, environment and planned-test information. Example percentages are not universal thresholds.
NASA/SP-2016-6105 Rev 2, Systems Engineering Handbook, §5.3.1.2.1, printed pp. 92–93/PDF pp. 102–103; Table 5.3-1, printed p. 94/PDF p. 104. Preparation, observation steps, measurement characteristics, configuration and anomaly handling. The table gives example procedure/report information, not a mandatory record schema.
Systems Engineering Guidebook, September 2026, §5.2, printed p. 58/PDF p. 68. Explicitly directs TRR to the 2022 T&E Enterprise Guidebook. It supplies no separate 2026 TRR table in that section.
Test and Evaluation Enterprise Guidebook, August 2022, Chapter 1 §§1, 3.2 and 7; especially printed p. 31/PDF p. 36. Plans, resources and preparation are distinguished from execution and data validity. The guide gives policy precedence in a conflict.
DoDI 5000.98, effective 9 December 2024, purpose; §§1.1, 2.7.b and 4.2. Supersedes the OT&E/LFT&E information in DoDI 5000.89, not all of that instruction. Section 2.7.b concerns the OT&E/LFT&E readiness process; §4.2 specifies content for OT&E and full-up-system-level LFT&E. This is not a universal private software TRR rule.

Inspectability of this example: the rule, described transformation, proposed checks and complete review record are on this page. No fixture implementation, application, instrument reading, run log, completed correction or retest is supplied. A linked source, model result or finite test campaign would not by itself establish production correctness or certification.

10 / Apply the review to another gap

Two more readiness decisions

A latency test stops timing at acknowledgment

Illustrative plan; NOT EXECUTED. Suppose a requirement concerns time until an operation finishes, but the procedure stops its timer when a queue acknowledges receipt. The setup could collect accurate numbers for the wrong interval.

Name the start and completion events, workload, units, clock basis and allowed bound from the actual requirement. The smallest proposed check pairs a request with its real completion event and verifies that the capture can measure that interval. Keep timing-instrument effects visible. An acknowledgment-only measurement would not support the completion-latency claim.

Which prior readiness support can be reused?

Illustrative review; no new execution. A prior readiness record identifies one fixture configuration; the planned campaign uses a revised conversion layer. Reusing the old decision would require a justified relationship between the reviewed and intended paths.

Decide which prior support remains applicable by comparing changed transformations, observation points and relevant candidate identity. Retain unaffected support where justified, and propose only the affected path or observation checks. Record who can approve reuse and any new conditions.

11 / Resolve the remaining questions

Test readiness review questions

Who may authorize execution after a TRR?

Use the authority assigned by the adopted process. The review chair, test director, risk-acceptance authority and release authority may have different responsibilities. NASA's signed Decision Authority memorandum provision in NPR 7123.1D §5.2.3.1 concerns life-cycle review completion; it is not automatically the required form for every technical TRR.

Does a TRR need prior passing test results?

It can require relevant prior results under its adopted criteria. A later integration or operational campaign may depend on earlier evidence. For example, DoDI 5000.98 §4.2 includes prior results within its defined operational/live-fire scope. This does not mean the future campaign must already have passed, or that every campaign uses the same coverage or pass threshold.

Can a small team use a document review instead of a formal board?

The governing process determines the required formality. A compact review can retain the requirement, setup, evidence gap, owners and actual scoped decision; a regulated or contracted program may require additional reviews and records. NASA's 2016 preparation guidance describes readiness reviews at different levels of formality with tailored criteria.

What changes when AI generated the procedure or expected result?

Check whether the generated material assumes that a requested input reaches the application unchanged, or derives its expected result from the same fixture description. The relevant question remains whether the planned evidence can answer the agreed requirement. Historical AI use in this sensor illustration is unknown. AI-generated prose cannot fill an absent delivery or response observation.