Situation at recovery / Behavior to specify / What the available illustration supports
Situation at recovery Behavior to specify What the available illustration supports
Same agreed source content/version throughout recovery Continue the interrupted import; completed portions contribute once, remaining work finishes, and the result matches the expected uninterrupted result for that source. A teaching promise. Its environmental support and responsibility are missing.
Source content/version has changed An authorized policy must say whether to refuse, start a new import, seek an operator decision or support changed sources. No selected or approved policy is supplied.
The unchanged-source condition cannot be established An authorized policy must address uncertainty explicitly. No rule resolves the uncertainty. The same filename alone does not establish unchanged contents.

Finding: the missing evidence is documentary support for the condition and its relationship to the promise, plus required exception behavior. No failed import, implemented correction or actual SRR disposition is supplied.

01 / Define the decision

What does a system requirements review decide?

SRR examines whether needs have become a coherent, scoped system promise that can guide subsequent work. Review the set's behavior, interfaces, constraints, assumptions, feasibility and planned verification together. Individually clear statements can still contradict one another or leave a responsibility unallocated.

A parent relationship is the recorded connection from a requirement to the higher-level need or requirement it is intended to satisfy. The link helps locate the reasoning. Its presence does not establish that the child preserves the parent's intent. NASA's requirements-definition method, §4.2 separates wording checks from technical correctness, valid assumptions, stakeholder fit, feasibility and verifiability.

Choose the review by the question it must answer. These distinctions describe scope; your adopted lifecycle determines the actual sequence and approvals.

Review / Main question
Review Main question
Individual requirement review Is this statement meaningful, justified, consistent and reviewable in context?
Software requirements specification (SRS) review Are the requirements allocated to the software coherent, complete enough for their purpose and verifiable?
System requirements review Does the identified system requirement set adequately translate stakeholder/parent needs, including relevant human, hardware, software and external responsibilities, for the next commitment?
Preliminary design review (PDR) Does the proposed architecture have sufficient support to proceed into detailed design?
Critical design review (CDR) Is the detailed design sufficiently mature for the named implementation, integration or test commitment?
Test readiness review (TRR) Can the named planned test or campaign produce interpretable evidence with its candidate, setup and procedures?
Proof Software Requirements Review What do the configured software-stage criteria report about the available project state? This is a product assessment.

NASA's Appendix G distinguishes lifecycle reviews. Its software handbook also uses separate software SRR and SwRR labels. The shared initials do not make these activities interchangeable.

Identify the governing project plan, contract or other applicable basis, its edition, tailored criteria and decision roles. Agency criteria apply within their stated scope, not automatically to every commercial team. The source-specific interpretations preserve those boundaries.

02 / Start with the free worksheet

A complete human worksheet for one requirements decision

Copy this record into your review document. Start with the promise, its parent need and the assumption in groups 2 and 3; then complete the decision and closure fields. A requirement document, stakeholder material and relevant agreements can support this work before code exists.

Use UNKNOWN for a fact not established, UNASSIGNED for an unappointed owner, and UNRECORDED for a decision with no supplied record. Label future clarification or review PROPOSED, NOT PERFORMED, and future behavioral checks PROPOSED, NOT EXECUTED. An oracle is the rule used to decide whether a later observation meets the requirement.

This is an original first-review aid for one thread, not an official full SRR package or an AI prompt.

HUMAN SYSTEM REQUIREMENTS REVIEW RECORD

1. DECISION / CANDIDATE / BASIS / AUTHORITY
Requirement set or document, candidate revision and location:
Named next commitment this review must support:
Adopted criterion, source/edition and reason it applies:
Authorized tailoring, exclusions or additional governing obligations:
Review lead/participants and their review responsibility:
Who may approve the requirements, change scope and decide residual issues?
Record actual authority and its basis, or UNKNOWN. Do not infer it from a title.

2. STAKEHOLDER PROMISE / RELATIONSHIPS / SCOPE
Stakeholder or parent need, source/revision and approved wording:
Proposed system promise, with normal, error and recovery outcomes:
Parent relationship: explain how this promise serves the higher-level need.
Intended users, interfaces and affected responsibilities:
Included behavior and operating conditions:
Excluded behavior, justification and authority for any changed obligation:
Check for a conflict with an earlier promise; record it if unresolved.

3. ASSUMPTION / RATIONALE / RESPONSIBILITY / SUPPORT
Precise condition, including when and where it must hold:
What promise depends on it, and why is the condition credible?
Who supplies or maintains the condition? Name the dependency and owner.
Inspectable agreement, analysis or other support, with location/revision:
What is missing, disputed or outside that material's scope?
If no owner is appointed, write UNASSIGNED and add an appointment in group 6.

4. SAME / CHANGED / UNCERTAIN SCENARIOS / PLANNED ORACLE / EVIDENCE
Use same/changed/uncertain for a source condition, or the equivalent
condition-holds / condition-absent / cannot-establish-condition cases.

SAME: describe the normal action and established condition.
Required useful outcome:
Proposed observation and acceptance rule:
Available supporting material and its limits; check status:

CHANGED: describe the action with the condition absent or changed.
Required behavior, or policy still needing an authorized decision:
Proposed observation and acceptance rule, conditional on that decision:
Available supporting material and its limits; check status:

UNCERTAIN: describe the action when the condition cannot be established.
Required behavior, or policy still needing an authorized decision:
Proposed observation and acceptance rule, conditional on that decision:
Available supporting material and its limits; check status:

Separate a proposed criterion from a performed review or behavioral result.
Do not turn missing evidence into PASS or an observed failure.

5. DOCUMENTARY FINDING / AFFECTED COMMITMENT
Exact contradiction, missing rule or unsupported assumption:
Connection to the stakeholder promise and relevant review criterion:
Which next decision or reliance cannot currently be supported, and why?
What can the available documents establish? What remains unknown?

6. OWNED PROPOSED CLOSURE / APPOINTMENT / PRELIMINARY VERIFICATION / TRIGGER
Required decision or clarification:
Agreement, analysis or other evidence needed:
Accountable requirement/assumption/interface owner, or UNASSIGNED:
If unassigned, who must identify the appointing authority and request
the appointment? Record the concrete next action.
Preliminary verification method, observation and oracle:
Closure reviewer, review point/due condition and criterion for closing:
Change that reopens the question:
Mark proposed work NOT PERFORMED or NOT EXECUTED, as appropriate.

7. RECOMMENDATION versus ACTUAL AUTHORIZED DISPOSITION / BASELINE / REOPENING
Reviewer recommendation and the exact promise/commitment it covers:
Actual authorized decision, authority, record and any conditions:
Use UNRECORDED if no decision record exists.
Requirement baseline/revision and scope actually authorized, or UNKNOWN:
Separately supported work and its own governing decision:
Who will reassess affected evidence, and under which reopening trigger?
A recommendation does not itself authorize a hold, acceptance or scope change.

03 / Inspect the documentary gap

Worked record: the source condition lacks documentary support

The review attempt is to determine whether “resumable import for immutable sources” provides enough direction for initial design. Compare that scope statement with the teaching promise above: an operator should be able to continue interrupted work toward the agreed result when the source stays unchanged.

For the promise to guide design, the documents would need to explain why that condition is valid, who maintains it, how the restriction fits the stakeholder need, and what behavior is required when it fails or cannot be established. The available illustration provides none of that support. This is a finding about the documents; actual application behavior is unknown.

What would close this finding?

The proposed closure is to reconcile the original need with the restricted promise, obtain a supported condition and accountable owner, and authorize observable changed-source and uncertain-source behavior. Refusal, a new import, an operator decision and mutable-source support remain alternatives. Automatically refusing every recovery would prevent the required normal resumption.

The following record keeps those decisions open while defining useful preliminary observations. All clarification and closure work is proposed and NOT PERFORMED. All behavioral checks are NOT EXECUTED.

Filled human record: illustrative import recovery

HUMAN SYSTEM REQUIREMENTS REVIEW RECORD: ILLUSTRATIVE IMPORT RECOVERY

1. DECISION / CANDIDATE / BASIS / AUTHORITY
Actual project, requirement-set identity, candidate revision and location:
UNKNOWN.
Illustrative next commitment: use the recovery promise to guide initial
system design; consider it for the requirement baseline.
Actual adopted criterion/edition/applicability and tailoring: UNKNOWN.
Review lead, participants and decision authority: UNKNOWN.
Authority to change stakeholder obligations or contractual scope: UNKNOWN.
This record contributes one thread; it does not decide whole-set readiness.

2. STAKEHOLDER PROMISE / RELATIONSHIPS / SCOPE
Teaching parent need: an operator can finish legitimate import work after
an interruption without abandoning the contribution of completed work.
Actual parent identifier, revision, approved wording and prior promises:
UNKNOWN.
Chosen illustrative system promise: when the relevant source contents/version
remain unchanged, continue the interrupted import: retain completed portions
once, finish the remaining work, and produce the requirement's expected
uninterrupted result for that same content/version.
Parent relationship: this recovery promise is intended to serve the
operator's completion need. No actual approved trace relationship is supplied.
Teaching participants/interfaces: operator, import service and source provider.
Actual users, deployment, input format and interface agreement: UNKNOWN.
Illustrative proposed condition: unchanged contents/version from import
start through interruption and resumed completion.
Changed-source and uncertain-source handling: UNDECIDED.
Actual approved exclusions and authority to narrow prior promises: UNKNOWN.

3. ASSUMPTION / RATIONALE / RESPONSIBILITY / SUPPORT
Condition: all source contents relevant to this import remain those of the
agreed version from import start through interruption and resumed completion.
Dependency: the proposed continuation relies on that content continuity.
Why the condition is valid in an actual operating environment: UNKNOWN.
Actual agreement, guarantee or supporting analysis: UNKNOWN; none supplied.
Responsibility for the condition: UNASSIGNED.
Requirement/assumption/interface owner: UNASSIGNED.
A justified upstream or process agreement could support the condition.
No importer enforcement mechanism is prescribed or claimed implemented.

4. SAME / CHANGED / UNCERTAIN SCENARIOS / PLANNED ORACLE / EVIDENCE
SAME: an operator requests continuation after interruption; the agreed
unchanged-source condition is established.
Chosen teaching outcome: continue the interrupted import; completed portions
contribute once, remaining work finishes, and the completed result matches
the requirement's expected uninterrupted result for the same source version.
Proposed oracle: compare the completed result against that specified
expectation, including both the previously completed and remaining portions.
An outcome that omits a portion or includes a completed portion twice would
contradict this teaching rule. Refusing all resumption would also fail it.
Actual approved result definition, representation and observation method:
UNKNOWN; clarification required before a real check.
Support: teaching promise only; real agreement and behavior evidence absent.
Check status: PROPOSED, NOT EXECUTED.

CHANGED: recovery is requested after relevant source contents/version change.
Required exception policy: UNDECIDED; authority must reconcile the parent
need before choosing refusal, a new import, an operator decision or support
for changed sources.
Proposed criteria depend on the authorized policy. If refusal is chosen,
observe refusal without a completion claim for the original import. If a
new import is chosen, distinguish it from continuation of the original.
If an operator decision is required, observe that decision before the
permitted next action. If changed-source support is chosen, first specify
which content the completed result must represent.
Support: no approved exception rule or observed behavior supplied.
Policy clarification: PROPOSED, NOT PERFORMED.
Behavioral check: PROPOSED, NOT EXECUTED.

UNCERTAIN: recovery is requested but the unchanged-source condition cannot
be established.
Required exception policy: UNDECIDED; uncertainty cannot be silently treated
as an established same-source condition.
Proposed oracle: compare handling of the unresolved condition, any operator
decision and the reported outcome with the policy once authorized.
Responsibility may sit in the service, an upstream party or an agreed process.
Support: no approved uncertainty rule or observed behavior supplied.
Policy clarification: PROPOSED, NOT PERFORMED.
Behavioral check: PROPOSED, NOT EXECUTED.

5. DOCUMENTARY FINDING / AFFECTED COMMITMENT
The immutable-source label does not justify the condition, assign
responsibility, demonstrate fit with the parent need or define changed/
uncertain-source behavior.
Affected commitment: relying on this recovery promise as an agreed basis
for initial design, or including it as settled in a requirement baseline.
The illustration identifies an intended boundary; it does not establish
readiness within that boundary. No actual failed import is reported.
Other requirements and the whole set's readiness have not been assessed.

6. OWNED PROPOSED CLOSURE / APPOINTMENT / PRELIMINARY VERIFICATION / TRIGGER
Required decision: reconcile the recovery need, supported source condition
and exception policies with the authority that may approve those obligations.
Needed support: an inspectable source/interface or operating agreement
covering the condition and responsibility; revised requirement text covering
normal, changed and uncertain cases; preliminary verification criteria.
Accountable owner: UNASSIGNED.
Proposed appointment action: the review organizer must identify the
appointing authority in the adopted governance and request an accountable
requirement owner, with assumption/interface and verification contributors.
Actual organizer and appointing authority: UNKNOWN; appointment NOT PERFORMED.
Proposed closure review: the appointed owner submits the revised promise,
parent relationship, supporting agreement and scenario criteria to the
designated reviewer and decision authority before reliance or baselining.
Actual closure reviewer and calendar date: UNKNOWN.
Closure criterion: the condition is justified and assigned, prior obligations
are reconciled, each case has an authorized observable outcome, and the
designated authority records the scoped disposition.
Preliminary verification: documentary inspection of that agreement and
scenario rules; later selected recovery checks using the oracles in group 4.
Documentary closure work: PROPOSED, NOT PERFORMED.
Behavioral checks: PROPOSED, NOT EXECUTED.
Reopen if the parent promise, source agreement, responsibility, recovery
conditions or required exception behavior changes.

7. RECOMMENDATION versus ACTUAL AUTHORIZED DISPOSITION / BASELINE / REOPENING
Illustrative recommendation: defer reliance on, or baselining of, the
affected recovery promise pending the specified decisions and support.
Actual authorized disposition and decision record: UNRECORDED.
Actual authorized baseline/revision, accepted scope and conditions: UNKNOWN.
This recommendation is not an authorized hold, risk acceptance, scope change
or completed SRR. Separately supported work needs its own governing decision.
Proposed follow-up owner: the requirement owner after appointment; currently
UNASSIGNED. Reassess this thread under the group 6 triggers and record any
new authorized disposition.

Use the worksheet on your own assumption: locate the unsupported condition, record what would support it, and identify who must decide the unresolved behavior.

Follow the review in six steps

Download the spoken transcript.

Read the narration and on-screen details

1. Choose the promise

On screen

  • Scope: one consequential promise
  • Basis: stakeholder or parent need
  • Question: absent or uncertain condition
  • Record: next commitment

Status: PROPOSED REVIEW ACTION; PROJECT REVIEW NOT PERFORMED

Narration

Start a system requirements review with one consequential promise and the next commitment it must support. Find the stakeholder or parent need, then name a condition the promise relies on. Ask what must happen if that condition is absent or uncertain. The free worksheet records this thread before implementation exists.

2. Define useful resumption

On screen

  • Completed portions contribute once
  • Remaining work must finish
  • Source content/version stays unchanged
  • Result: expected uninterrupted outcome

Status: ILLUSTRATIVE REQUIREMENT; NOT EXECUTED

Narration

Consider an illustrative import service. Resumption should retain completed portions once, finish the remaining work, and produce the requirement's expected uninterrupted result for the same source content and version. Those contents must stay unchanged through interruption and resumed completion. This is a teaching promise, not an approved project specification.

3. Identify the documentary gap

On screen

  • Support: not supplied
  • Owner: UNASSIGNED
  • Exception policy: UNDECIDED
  • Application result: not supplied

Status: ILLUSTRATIVE DOCUMENTARY FINDING; NO EXECUTION

Narration

The description says immutable sources only. It provides no supporting agreement, responsible owner, or authorized behavior for changed or uncertain sources. A matching filename does not establish unchanged contents. The finding is missing documentary support and an exception rule. No import failure or actual application result is supplied here.

4. Keep normal recovery possible

On screen

  • Same source: useful resumption
  • Changed source: policy unresolved
  • Uncertain source: policy unresolved
  • Authority must reconcile the promise

Status: ILLUSTRATIVE POLICY OPTIONS; AUTHORIZATION UNRECORDED

Narration

Compare recovery from the same source with recovery after a change or when continuity cannot be established. Normal resumption must remain useful. Refusal, starting a new import, an operator decision, or supporting changed sources are policy choices. The responsible authority must reconcile those choices with the original stakeholder promise.

5. Propose observable closure

On screen

  • Condition support: proposed
  • Owner appointment: proposed
  • Scenario criteria: proposed
  • Behavioral checks: NOT EXECUTED

Status: CLARIFICATIONS NOT PERFORMED; CHECKS NOT EXECUTED

Narration

Propose an agreement that supports the condition, an accountable owner, and observable criteria for each relevant scenario. An upstream party or operating process may maintain the condition. Plan how later observations would distinguish required behavior from a plausible mistake. Clarifications are not performed, and behavioral checks are not executed.

6. Separate advice from authorization

On screen

  • Recommendation: defer affected reliance
  • Actual authority: UNKNOWN
  • Actual disposition: UNRECORDED
  • Reopen on changed promises or support

Status: ILLUSTRATIVE RECOMMENDATION; DISPOSITION UNRECORDED

Narration

The illustrative recommendation is to defer reliance on the affected recovery promise until its support and exception decisions are reviewed. Actual authority is unknown, and actual disposition is unrecorded. This thread cannot approve the whole set. Record the next appointment, the required decision, and the change that would reopen review.

04 / Work through the decision in order

How to prepare and conduct a useful SRR

  1. Identify the candidate and commitment. Name the requirement-set revision and what the next stage will rely on. Separate an exploratory design activity from a commitment that assumes the requirements are agreed.
  2. Establish the review basis and authority. Locate the applicable plan, criteria, edition, tailoring and required products. Identify who reviews, who appoints owners, who controls the requirements, and who may decide scope or residual issues.
  3. Read the need-to-system relationships. Compare the requirement text with stakeholder expectations and parent requirements. Examine interfaces and allocations across the relevant software, hardware, people and external services. A complete link list can still connect incompatible promises.
  4. Challenge consequential conditions. Use normal, failure and recovery scenarios to test the meaning of the set. Ask who makes each precondition credible, what support exists, and what behavior applies when it is absent or unknown. Record conflicts and unsupported assumptions.
  5. Assess feasibility and planned verifiability. Consider the relevant technical, resource, schedule, safety, security and operational constraints. State an observation and acceptance rule for each selected claim. Resolve an unknown expected outcome before treating a proposed test as adequate.
  6. Turn findings into owned work. Identify the affected commitment, necessary decision, supporting material and closure criterion. For every unassigned task, specify who must obtain the appointment and when the answer is needed.
  7. Record recommendation and disposition separately. Submit the scoped findings to the designated authority. Retain its actual decision, conditions and baseline effects. Track agreed actions and reassess the affected evidence when its basis changes.

This procedure adapts the NASA handbook's requirements-validation method to a small review record. The complete SRR still follows the project's adopted criteria.

05 / Check the handoff

Before the requirements guide the next stage

  • The requirement-set revision and intended next commitment are identifiable.
  • The applicable criteria, required products and decision authority are established.
  • Stakeholder needs, system scope, interfaces and responsibilities agree.
  • Consequential assumptions have rationale, support and accountable ownership.
  • Relevant normal, error and recovery outcomes are defined or explicitly unresolved.
  • Preliminary verification criteria address the promise and its conditions.
  • Open findings identify affected commitments, owners, closure evidence and review points.
  • The actual disposition is recorded separately from the recommendation.
  • Baseline effects and reopening triggers are explicit.

An unchecked item identifies work to assess under the governing criteria. This checklist does not independently decide which remaining items an authority may accept.

06 / Avoid misleading readiness

Common SRR mistakes and their repairs

Failure modes that a tidy requirement document can conceal.

Mistake / Why it changes the decision / Repair
Mistake Why it changes the decision Repair
Review statements individually and never compare them Two understandable requirements can demand incompatible behavior at an interface. Walk one consequential scenario across the connected responsibilities.
Narrow scope to remove an awkward obligation A convenient assumption can silently discard a stakeholder commitment. Preserve the original need and seek the authority required to change it.
Put a design mechanism where a requirement decision belongs A proposed lock or snapshot does not explain which behavior stakeholders need. Settle the condition, responsibility and exception rule before selecting the mechanism.
Approve an unknown expected outcome because a test is planned The future check has no justified rule for judging success. Resolve the oracle and record its source before relying on the plan.
Leave “owner TBD” with no appointment action The finding can remain open without anyone responsible for progressing it. Name the action that obtains an accountable owner and its decision deadline.
Treat every open item alike A harmless elaboration and an unresolved operating obligation can affect different commitments. Assess each item's consequence under the actual criterion and permitted disposition.

07 / Use Proof within its scope

What Proof's Software Requirements Review can contribute

Proof calls its gate Software Requirements Review. It can organize a configured software-stage assessment; it does not conduct an official system SRR or confer authority to approve requirements.

For an existing configured Proof project, with the CLI installed, use the relevant project context after locating/loading its configuration and meeting its configured command, check-policy and workflow prerequisites. Required configured stage checks may execute:

proof gate srr --format markdown

No Proof, application or solver command ran for this example, and no output is supplied.

Interpret the criteria, not just the overall status:

  • Relationships and review progress: a recorded parent or satisfies link claims a relationship; it does not establish correct intent. All active requirements remaining in draft fail review progress; partial review produces a warning.
  • Formal-analysis state: this criterion selects active requirements with nonempty FRETish text whose formalization does not skip local proof. FRETish is the structured requirement text used for that selection. The criterion reads persisted derived results; it never runs the solver itself. Required realizability must be recorded as realizable or not applicable, consistency must be checked, and non-vacuity must be checked OK. Realizability concerns whether the modeled obligations can be met; consistency concerns conflicting modeled requirements; non-vacuity concerns trivial satisfaction, such as a condition that can never arise. Missing or unknown required state fails the criterion. If no formal requirement is applicable, that makes only this criterion pass.
  • Accepted risks: active blocking accepted risks fail; active nonblocking accepted risks warn.
  • Overall result: any failure yields not_ready; otherwise warnings yield ready_with_observations; otherwise the result is ready. Other configured criteria still apply.

Use the report to locate evidence and unresolved obligations. A favorable status cannot settle the import's stakeholder policy, demonstrate unobserved behavior, or authorize proceeding. Changing a status field cannot supply the missing decision.

08 / Choose the method that answers the question

Which review method will resolve your uncertainty?

Select the method after naming what is unknown. The choices below are practical adaptations of the cited methods, not a tool benchmark.

Uncertainty / Useful method or workflow / What remains outside its conclusion
Uncertainty Useful method or workflow What remains outside its conclusion
Does the system promise preserve the stakeholder need? Compare both texts with relevant stakeholders and inspect the rationale, using the NASA handbook's validation questions. A trace link alone cannot establish agreement or authority.
Is an external condition credible and assigned? Review the relevant interface or operating agreement with the responsible parties; retain its scope and rationale. The handbook explicitly addresses assumptions and relationships. A documented condition still needs support appropriate to the environment.
Can the requirement be assessed later? Develop scenarios, preliminary methods and observable acceptance rules. NASA PAT-067, version 8 includes preliminary V&V planning. A proposed criterion supplies no execution evidence. Apply the checklist within its tailored software context.
Is the whole set mature enough for the next stage? Use the applicable lifecycle criteria, required products and authorized review process; connect individual findings to that assessment. Completing one worksheet cannot substitute for the broader review.
Does an existing Proof project's recorded state meet its configured software-stage criteria? Inspect the optional gate's individual criteria. Product readiness is not system approval or proof of stakeholder intent.

A document and action register can carry this work. More structured records are useful when revisions and relationships become hard to follow; the storage format does not resolve disputed meaning.

09 / Inspect the sources and reasoning

Primary sources and a review another person can inspect

Defense: initial design, tailored criteria and the SFR boundary

The September 2026 Systems Engineering Guidebook, §5.4 and Table 5-2, printed pages 61–65, treats SRR as readiness for initial design. The chief engineer tailors criteria in the systems engineering plan (SEP); entry calls for those criteria to be met, prior technical reviews completed and their action items closed. The review chair determines completion, and the program manager manages and approves performance-specification changes. Reviewed products support functional definition and preliminary design. Adjacent §5.5 places normal functional-baseline configuration control at SFR.

Within its actual DoD, acquisition-pathway and SEP applicability, DoDI 5000.88, 18 November 2020, §3.5.a(2) lists SRR or SFR, or equivalents, unless waived through SEP approval. It does not universally require two separate reviews.

The guidebook names ISO/IEC/IEEE 24748-8 as a preparation resource. The licensed standard was not accessed; no clause-level conformance claim is made.

NPR 7123.1D, Change 2 became effective on 5 July 2023; Change 2 was approved on 20 February 2024. Its Preface, P.2 defines NASA/support applicability and application to other parties through relevant contracts, grants or agreements, with authorized tailoring.

Within that applicability, §5.2.2.2.b requires baselined requirements SE-39, a baselined Human Systems Integration approach SE-66, and a baselined Systems Engineering Management Plan (SEMP) or equivalent SE-38 for projects, single-project programs and one-step Announcement of Opportunity programs. Appendix G's recommended status does not cancel these minima.

Use Table G-1 for programs other than single-project programs and Table G-4 for projects and single-project programs. G-4 permits a plan to complete lower-level requirements within schedule constraints; it does not universally require finished detailed software requirements, code or tests at SRR.

The tables allow specified unresolved items with acceptable disposition plans and schedules. Preserve that provision separately from the defense guide's prior-action closure wording. Neither establishes that every open question may remain unresolved.

Under §5.2.2.4 , designated baseline products enter review as at least final drafts and become formally baselined after approved comments are incorporated. Appendix F explains that baselining need not mean full maturity; changes remain controlled.

NASA's §5.2.3.1 completion process includes agreed dispositions and action controls, board records, and a signed Program/Project Decision Authority memo. That is an applicable NASA process, not a universal private-team form or permission for a worksheet to approve itself.

Method guidance and software-specific criteria

The NASA Systems Engineering Handbook, NASA/SP-2016-6105 Rev 2, §4.2, supports reviewing assumptions, rationale, relationships, ownership and verifiability. It is explanatory 2016 guidance; this article's seven-group record is an original adaptation.

Software Engineering Handbook Version D, Topic 7.09 and its PAT-067 version 8 provide tailored software review guidance. They do not prescribe universal stakeholder unanimity, general AI-coding rules or this record's shape.

What can be checked in this example?

Inspect the stated teaching promise, compare the three source situations, and check whether the filled record correctly identifies the support and decisions missing from the illustration. Its conclusion is a documentary gap. The proposed closure remains unperformed.

The product section describes conditional gate behavior separately. There is no application run, solver result, Proof report or actual SRR disposition to reproduce. In your own review, retain the requirement revision, parent material, supporting agreements, findings and actual decision so another reviewer can follow the same reasoning.

10 / Apply the method to a different gap

Two additional documentary examples

A warning requirement depends on an unavailable operator

Illustrative scenario, review not performed. A system requirement says to warn an operator when a consequential condition occurs. The operating concept permits unattended use. Each document can look reasonable alone, but the warning requirement does not explain who responds during that period or what the system must achieve meanwhile.

The next decision concerns the required outcome and allocation of responsibility. Possible changes to staffing, operating scope or automatic behavior need the appropriate authority. A preliminary criterion would describe the required system outcome during unattended operation and how a later review or exercise would assess it. No such behavior is claimed tested.

An aggregate limit has no agreed allocation

Illustrative scenario, analysis not performed. A parent requirement limits the time from a user's request to a completed result. Two components each promise to meet the entire limit, while their work occurs sequentially. Both child statements can link to the parent without establishing that their combined behavior can meet it.

Proposed closure: agree the end-to-end measurement boundary, allocate a feasible budget across responsibilities, and record relevant workload and interface assumptions. The preliminary oracle compares the agreed request-to-completion interval with the parent limit under those conditions. No timing value or measurement is supplied.

11 / Resolve the remaining questions

System requirements review questions, answered

Can SRR happen before software exists?

Yes. Requirements, stakeholder material, interface agreements, feasibility work and preliminary verification approaches can support the review. What must exist depends on the adopted lifecycle criteria. Planned verifiability does not require pretending that later behavioral checks have already run.

Can a review proceed with TBD or TBR items?

Sometimes, under its governing criteria. Record what is to be determined or resolved, the consequence, owner, closure plan and decision authority. An acceptable plan for later detail is different from silently leaving the meaning of a consequential obligation undecided. The NASA and defense provisions should not be combined into a universal rule.

Who may accept the requirements or change the scope?

The authority designated by the applicable project governance and agreements. Reviewers can recommend a disposition; stakeholder involvement informs it. Neither attendance, majority agreement, a job title nor a product report automatically grants power to change a contractual obligation.

Must the importer detect every source change itself?

No universal mechanism follows from this illustration. An upstream party or operating process may establish a justified condition. The requirement still needs an accountable responsibility, credible support and an agreed treatment of situations outside that condition. Later design and verification assess the chosen mechanism.

What if AI generated the requirement or recovered its intent?

Treat the text and inferred relationships as proposals. Compare them with the actual stakeholder need and supporting material, and route unresolved choices to the proper authority.

What if our first reviewed thread has no gap?

Record the support and its limits without manufacturing a finding. Then assess the remaining requirement set against the adopted criteria. A sound individual thread is useful evidence; it does not establish that other requirements, interfaces or obligations are ready.